Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Radwa

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Radwa

Pool waterproofing before tiling in Radwa starts with a WhatsApp message including photos of the floor, walls and corners. Private pools in this district vary widely in size and age, and need thorough concrete treatment before tiling to prevent damp later.

Radwa features villas with private gardens that shelter pools of various sizes, from small paddling pools to larger ones. Its concrete can crack under intense heat and coastal humidity, especially at corners and pipe entries where stress concentrates. Treating these areas before adhesive and tile go on prevents water seeping beneath the surface. Photos reveal the actual concrete condition and show whether cracks or joint weakness exist.

  • Radwa is a district in the Eastern Province, close to Ar Rawdah and Ra's Tannurah, with residential villas and private gardens.
  • The corners and wall-floor joints of a concrete pool are the weakest points for cracks and leaks.
What the service includes

What we do for you in Radwa

  • Inspecting the concrete and locating cracks and hairline cracks
  • Checking the layer is complete before tiling is allowed to begin
  • Applying the waterproof layer across the floor, walls and pool rim
  • Closing feed and drain pipe inlets and light fitting openings
How we work

The steps of pool waterproofing before tiling in Radwa

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Pool waterproofing before tiling in RadwaWe choose the method and the materials once we know the condition of the spot.

Radwa is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing before tiling in Radwa

When should a pool floor be waterproofed before tiling in Radwa?

Right after pouring the concrete and letting it cure enough. Sending photos of the floor and walls helps us determine whether the concrete is ready and what treatment is needed.

Is corner treatment before tiling necessary for pools in Radwa?

Yes, corners are most prone to cracking and leaks. Treating them before tiling stops problems before they start.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

How do I request pool waterproofing before tiling in Radwa?

Call us, or send clear photos of the spot and its location in Radwa on WhatsApp, and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Ar Rawdah (near Ra's Tannurah), Ra's Tannurah and Najmah.

Other services in the area

More services in Radwa

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Radwa?
Call us now

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp