
Pool waterproofing before tiling in Prince Naif
Pool waterproofing before tiling in Prince Naif begins with photos of the concrete shell sent by call or WhatsApp. We treat the concrete, corners, joints and pipe inlets before tile adhesive and tiles are applied, to ensure lasting waterproofing and a sound finish base.
Prince Naif has villas and apartment buildings, some older and others newer, and many families install pools in the yard or beside the house. A new concrete shell needs careful treatment of hairline cracks and joints before it fills with water, while an older one may leak at corners or from pipe openings. Conditions vary greatly depending on the pool's age, concrete quality and build method, and the photos show which steps are needed before tiling.
- Prince Naif is a district in the Eastern Province, near Al Amal, Ar Rawdah and King Fahd, with villas and residential buildings of varying ages.
- Fresh concrete may contain hairline cracks invisible to the eye, but they cause leaks once the pool is filled.
The main items of pool waterproofing before tiling in Prince Naif
- Cleaning the surface and removing casting residue and dust
- Applying the waterproof layer across the floor, walls and pool rim
- Inspecting the concrete and locating cracks and hairline cracks
- Closing feed and drain pipe inlets and light fitting openings
The stages of the work in Prince Naif
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Prince Naif is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We serve Prince Naif and around itIncluding Al Amal (near Al Khafji), Ar Rawdah (near Al Khafji) and King Fahd, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Your questions on pool waterproofing before tiling in Prince Naif
When is the pool waterproofed, before or after tiling?
Waterproofing must come before tiling. We treat the concrete, joints and corners first, then tile adhesive goes on a prepared and sound surface. This ensures water does not penetrate the concrete beneath the tiles.
Do you treat old pools in Prince Naif before new tiling?
Yes, if the concrete is sound. We remove old tiles and inspect the shell, then treat any cracks or weakness before new tiling. The photos clarify the pool's condition and we tell you what will work.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
How long must the waterproof layer cure before tiles go on?
It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.
Does the surface have to be dry before the waterproof layer goes on?
It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.
Do you cover Prince Naif?
Yes. We serve Prince Naif and nearby areas such as Al Amal (near Al Khafji), Ar Rawdah (near Al Khafji) and King Fahd, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
The same service in nearby areas
If the site is outside Prince Naif, the same service is available in Al Amal (near Al Khafji), Ar Rawdah (near Al Khafji) and King Fahd.
More services in Prince Naif


