
Pool waterproofing before tiling in Muraytibah
Pool waterproofing before tiling in Muraytibah starts with photos of the floor, walls and corners, sent by call or WhatsApp. The hamlet has villas and small buildings, many with private pools that need careful preparation before tiling.
Muraytibah has villas and small residential buildings, with pools usually concrete-built into the ground or within the yard. Before tiling, the floor and walls must be treated for hairline cracks and small leaks, and joints and corners prepared carefully to withstand water and heat. Photos show the concrete condition and whether there is wear or old damp, which determines the treatment before the waterproof layer and tiles are laid.
- Muraytibah is a hamlet near Sudah, Al Ghuwaybah and At Taraf in the Eastern Province, with villas and small residential buildings.
- A dug-in concrete pool is under water pressure and thermal stress, so the waterproofing before tiling must be tight at every joint.
What we do for you in Muraytibah
- Checking the layer is complete before tiling is allowed to begin
- Applying the waterproof layer across the floor, walls and pool rim
- Treating corners and pour joints with a suitable compound
- Inspecting the concrete and locating cracks and hairline cracks
This is how we work in Muraytibah
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Start from Muraytibah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Muraytibah comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Common questions on pool waterproofing before tiling in Muraytibah
Should we repair cracks before calling you to waterproof the pool?
Send photos of the cracks and damp areas, and we will tell you whether they need repair first or our treatment will cover them. Some small cracks can be treated as part of the waterproofing process.
How long does pool waterproofing before tiling take in Muraytibah?
It depends on the pool size and concrete condition. Photos help us estimate the steps needed and arrange a time with you.
Does the surface have to be dry before the waterproof layer goes on?
It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.
How do I request pool waterproofing before tiling in Muraytibah?
Call us, or send clear photos of the spot and its location in Muraytibah on WhatsApp, and we will work out the next step with you.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
What materials are used to waterproof a pool shell before tiling?
Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.
We also offer it in neighbouring areas
Nearby areas we also cover: Sudah, Al Ghuwaybah and At Taraf.
More services in Muraytibah

