Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Mulayjah

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Mulayjah

We provide pool waterproofing before tiling in Mulayjah, beginning with photos of the pool shell, its corners and joints, sent by call or WhatsApp. The town has houses, villas and small farms, and its pools range from old to new.

Mulayjah is dominated by detached houses and villas on mid-sized plots, and its pools may form part of a farm or a wide yard. An older concrete shell usually shows cracking at the corners and pipe inlets, while a newer one generally needs its surface prepared before lining. Because the yard is open, the sun stays on the pool for many hours, and the photos decide whether the concrete can take the lining directly.

  • Mulayjah is a town in the Eastern Province, near Nita, As Sudayrah and Al Kahafah, with houses, villas and small farms.
  • A pool in an open yard is exposed to sun for longer, so its lining must tolerate heat as well as water.
What the service includes

What we do for you in Mulayjah

  • Applying the waterproof layer across the floor, walls and pool rim
  • Cleaning the surface and removing casting residue and dust
  • Treating corners and pour joints with a suitable compound
  • Inspecting the concrete and locating cracks and hairline cracks
How we work

From first contact to the finished job in Mulayjah

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Mulayjah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Pool waterproofing before tiling in MulayjahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Mulayjah

Can a pool on a farm in Mulayjah be waterproofed?

Yes, we serve Mulayjah. Send photos of the pool and its surroundings and tell us about the site, so we can plan access and sequence the work with you.

What decides the waterproofing method for a pool in Mulayjah?

It depends on the concrete at the corners, joints and pipe inlets, and then the age of the shell. The photos alone reveal this clearly before a method is chosen.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Do you offer pool waterproofing before tiling in Mulayjah?

Yes. Mulayjah is within our service area in the Eastern Province, and we also work in Nita, As Sudayrah and Al Kahafah. Call us or send photos of the spot on WhatsApp.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Nearby areas

We also offer it in neighbouring areas

We also work near Mulayjah, in Nita, As Sudayrah and Al Kahafah.

Other services in the area

More services in Mulayjah

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Mulayjah?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp