Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Industrial Arifi

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Industrial Arifi

In Industrial Arifi we treat pool basins before tiling, starting with photos of the basin and its surroundings sent by call or WhatsApp. The treatment covers the concrete shell, its corners, joints and pipe inlets so the base is ready for adhesive.

Industrial Arifi is an area of workshops, warehouses and commercial premises, and pools there may serve private compounds or facilities attached to buildings. Open basins face intense sun for long hours, which stresses joints and the shell. The photos establish the basin's condition and whether joint treatment or full shell lining is needed.

  • Industrial Arifi is an industrial and commercial area of Dammam in the Eastern Province, close to Al Yarmuk, Al Tawyah and Al Dabab.
  • An open basin in strong sun expands and contracts daily, so its joints are tested more than its shell.
What the service includes

The scope of the work in Industrial Arifi

  • Applying the waterproof layer across the floor, walls and pool rim
  • Cleaning the surface and removing casting residue and dust
  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
How we work

From first contact to the finished job in Industrial Arifi

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Industrial Arifi is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Industrial Arifi and around itIncluding Al Yarmuk (near Ghizlan), Al Tawyah and Al Dabab (near Ghizlan), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Industrial Arifi

Do you waterproof pools linked to facilities in Industrial Arifi?

Yes, we serve Industrial Arifi. Send photos of the basin and tell us what facility it is linked to so we can set the scope of treatment.

Does exposed sun affect a pool's tiling here?

Yes, daily expansion puts strain on joints and adhesive. For that reason joints and the shell are treated before tiling, and the photos show whether the basin needs extra care.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

How do I request pool waterproofing before tiling in Industrial Arifi?

Call us, or send clear photos of the spot and its location in Industrial Arifi on WhatsApp, and we will work out the next step with you.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Yarmuk (near Ghizlan), Al Tawyah and Al Dabab (near Ghizlan).

Other services in the area

More services in Industrial Arifi

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Industrial Arifi?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp