Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Badiah Al Basri

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Badiah Al Basri

Pool waterproofing before tiling in Badiah Al Basri starts with photos of the pool shell, its corners and pipe inlets, sent by call or WhatsApp. The district has houses and villas of varied sizes, and the lining depends on the state of the concrete before the tile adhesive goes on.

The district consists of houses and villas of varied sizes, and some pools there are old while others are newer. Older concrete often cracks at corners and joints, and water can escape from pipe inlets if they are not treated before tiling. The photos identify which parts need repair before the waterproofing layer is applied.

  • Badiah Al Basri is a district in the Eastern Province near Qatif, Ash Shariah and Al Qalah, dominated by houses and villas.
  • In an older pool, joints and pipe inlets are usually the first things to need treatment before tiling.
What the service includes

What the service covers in Badiah Al Basri

  • Checking the layer is complete before tiling is allowed to begin
  • Closing feed and drain pipe inlets and light fitting openings
  • Applying the waterproof layer across the floor, walls and pool rim
  • Treating corners and pour joints with a suitable compound
How we work

The stages of the work in Badiah Al Basri

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Start from Badiah Al Basri with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Badiah Al Basri is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing before tiling in Badiah Al Basri

Do you treat old cracks in a pool in Badiah Al Basri before waterproofing?

Yes, cracks and joints are treated first and the lining follows. If the cracks are wide or suggest weakness in the structure, the photos will show it.

Do you serve homes and villas in Badiah Al Basri?

Yes, we serve Badiah Al Basri. Send photos of the pool and its corners so we can agree what is needed before it is tiled.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

How do I request pool waterproofing before tiling in Badiah Al Basri?

Call us, or send clear photos of the spot and its location in Badiah Al Basri on WhatsApp, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

If the site is outside Badiah Al Basri, the same service is available in Qatif, Ash Shariah and Al Qalah.

Other services in the area

More services in Badiah Al Basri

Mosaic-tiled seaside pool

Tell us about your site in Badiah Al Basri
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp