Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in As Sulimaniyah

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in As Sulimaniyah

Pool waterproofing before tiling in As Sulimaniyah begins with WhatsApp photos of the pool base, walls and corners. Residential pools in this district need thorough concrete treatment before tiles are laid to ensure water does not seep beneath the layers.

As Sulimaniyah has relatively modern villas and apartment buildings, many with private pools in the yard or integrated into the layout. Fresh concrete often shows minor cracks after initial curing, and corners and joints between walls and floor need special care. Moisture and intense summer heat stress the surface, and photos reveal weak points precisely before tiling starts.

  • As Sulimaniyah is a district in the Eastern Province, near An Nuzhah, Al Faisaliyah and Ar Rabwah, with modern homes and private pools.
  • Joints between the pool floor and walls are the main weak points where water pressure and heat accumulate.
What the service includes

What the service covers in As Sulimaniyah

  • Cleaning the surface and removing casting residue and dust
  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
  • Inspecting the concrete and locating cracks and hairline cracks
How we work

The steps of pool waterproofing before tiling in As Sulimaniyah

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

As Sulimaniyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Pool waterproofing before tiling in As SulimaniyahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in As Sulimaniyah

Can a new pool in As Sulimaniyah be waterproofed before it is filled with water?

Yes, that is the ideal time. The concrete, cracks, corners and joints are treated, then full waterproofing is applied before the tiles. Send photos of the pool at this stage so we can assess it.

How can we be sure the waterproofing will withstand water and heat in As Sulimaniyah?

Material choice and method depend on the photos and inspection. The method is selected to withstand high temperatures and constant water pressure, with all cracks and weak points addressed beforehand.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

How do I request pool waterproofing before tiling in As Sulimaniyah?

Call us, or send clear photos of the spot and its location in As Sulimaniyah on WhatsApp, and we will work out the next step with you.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

Nearby areas

Areas near As Sulimaniyah

We also offer pool waterproofing before tiling in An Nuzhah (near Hafar Al-Batin), Al Faisaliyah (near Hafar Al-Batin) and Ar Rabwah (near Hafar Al-Batin), among the closest areas to As Sulimaniyah.

Other services in the area

More services in As Sulimaniyah

Mosaic-tiled seaside pool

In As Sulimaniyah and need pool waterproofing before tiling?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp