
Pool waterproofing before tiling in As Sarrar
Pool waterproofing before tiling in As Sarrar starts with a clear photo of the pool and concrete condition, sent by phone or WhatsApp. Pools in villages face sharp temperature swings and may hold trapped moisture under tiles.
As Sarrar is a small village with villas and family homes spread over wide spaces. Pools here face direct sun all day, causing concrete to expand and contract, showing as fine cracks around joints and corners. Moisture can collect under old tiles if the waterproofing was not good before. Treating cracks and refilling joints is needed before tiling to avoid later problems.
- As Sarrar is a village in the Eastern Province, near Al Khubrah and Az Zughayn, with scattered residential buildings.
- Pools inland face greater temperature swings than coastal ones, putting more strain on concrete.
The scope of the work in As Sarrar
- Checking the layer is complete before tiling is allowed to begin
- Inspecting the concrete and locating cracks and hairline cracks
- Treating corners and pour joints with a suitable compound
- Closing feed and drain pipe inlets and light fitting openings
From first contact to the finished job in As Sarrar
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.
Start from As Sarrar with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We serve As Sarrar and around itIncluding Al Khubrah, Az Zughayn and Rizhan, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Before you book pool waterproofing before tiling in As Sarrar
Are hairline cracks in the pool concrete dangerous before tiling?
Hairline cracks allow water to seep slowly through. Treating them before tiling prevents moisture buildup and decay of the structure underneath.
How often does a pool in As Sarrar need to be waterproofed again?
That depends on the quality of the first waterproofing and on how the pool is used and maintained. Photos help us tell whether the previous waterproofing has failed.
What materials are used to waterproof a pool shell before tiling?
Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.
Do you offer pool waterproofing before tiling in As Sarrar?
Yes. As Sarrar is within our service area in the Eastern Province, and we also work in Al Khubrah, Az Zughayn and Rizhan. Call us or send photos of the spot on WhatsApp.
What decides the cost of waterproofing a pool before tiling?
The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
We also offer it in neighbouring areas
Nearby areas we also cover: Al Khubrah, Az Zughayn and Rizhan.
More services in As Sarrar


