Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in An Narjis

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in An Narjis

Pool waterproofing before tiling in An Narjis begins with pool shell and crack photos sent via WhatsApp or by calling. The district contains residential villas with private pools, each concrete shell exposed to heat and humidity stress. Proper treatment before tiling ensures no water seeps behind the tile later.

Villas in An Narjis vary in age and size, many with private pools in their yards. Exposed concrete faces harsh heat and damp air near the coast, causing cycles of expansion and contraction. This opens small cracks at corners, joints and around pipe entries. If the pool is tiled without treating these cracks, water will penetrate behind the tile and cause damage. Photos help identify cracks precisely before choosing the right sealing method.

  • An Narjis is a district in the Eastern Province near Al Awwamiyah, Az Zarah and Ath Thuraiya, with residential villas and private pools.
  • Coastal humidity and heat together cause faster wear of concrete joints in pools.
What the service includes

The main items of pool waterproofing before tiling in An Narjis

  • Treating corners and pour joints with a suitable compound
  • Checking the layer is complete before tiling is allowed to begin
  • Applying the waterproof layer across the floor, walls and pool rim
  • Inspecting the concrete and locating cracks and hairline cracks
How we work

This is how we work in An Narjis

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

We serve An Narjis and around itIncluding Al Awwamiyah, Az Zarah and Ath Thuraiya, as part of our work across the Eastern Province.

Your request from An Narjis comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in An Narjis

Does a pool leak show before or after tiling?

A leak may not show before tiling because water is trapped in cracks. After tiling, water penetrates behind the tile and grout, reaching layers below and causing damage. This is why sealing before tiling stops the problem before it starts.

Does treating a pool before tiling take a long time?

The duration depends on the pool size, number of cracks and length of joints. Send photos so we can assess the condition with you and explain what steps are needed and in what order.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

What should I send you from An Narjis?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in An Narjis, and we will work out the next step with you.

Nearby areas

Areas near An Narjis

Nearby areas we also cover: Al Awwamiyah, Az Zarah and Ath Thuraiya.

Other services in the area

More services in An Narjis

Mosaic-tiled seaside pool

We start with you in An Narjis
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp