Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in An Nada

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in An Nada

Pool waterproofing before tiling in An Nada begins with photos sent to us by call or WhatsApp. The district has pools in villas and residential communities, varying in shape and depth, which affects how the concrete shell and joints are treated before tiles are applied.

Villas and compounds in An Nada contain pools of various sizes, many older with fine cracks visible in the concrete around corners and joints. Newer pools may only need gaps and pipe inlets treated before tiling. The hot climate and coastal humidity affect the shell's integrity, and photos reveal the floor and wall condition to determine what needs repair.

  • An Nada is a district in the Eastern Province, near Al Wahah and Al Faysaliyah, with villas and residential compounds.
  • An older concrete pool shell typically shows cracks at joints and corners before tiling.
What the service includes

The scope of the work in An Nada

  • Closing feed and drain pipe inlets and light fitting openings
  • Cleaning the surface and removing casting residue and dust
  • Checking the layer is complete before tiling is allowed to begin
  • Treating corners and pour joints with a suitable compound
How we work

How we carry out pool waterproofing before tiling in An Nada

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

An Nada is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from An Nada comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing before tiling in An Nada

How do you repair pool cracks before tiling in An Nada?

We fill cracks and gaps with suitable materials and repair the joints between concrete slabs. Send us photos of the pool and we identify the extent of cracking and areas needing treatment.

Does waterproofing a pool before tiling prevent water leaks later?

Proper treatment of the concrete shell and joints before tiling reduces the likelihood of leaks. The result depends on the tile quality and grouting afterwards, and on pool maintenance over time.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Do you cover An Nada?

Yes. We serve An Nada and nearby areas such as Al Wahah (near Dammam), Al Faysaliyah (near Dammam) and Ar Rawdah (near Dammam), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Nearby areas

The same service in nearby areas

If the site is outside An Nada, the same service is available in Al Wahah (near Dammam), Al Faysaliyah (near Dammam) and Ar Rawdah (near Dammam).

Other services in the area

More services in An Nada

Mosaic-tiled seaside pool

Your first step in An Nada:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp