Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Wurud (near Tarout)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Wurud (near Tarout)

Pool waterproofing before tiling in Al Wurud begins with photos showing the pool floor, walls, corners and joints, sent by call or WhatsApp. The area has villas and apartment buildings with yards containing pools of varied sizes and ages. Treating the concrete and joints before tile installation ensures no water leaks after tiling is complete.

Pools in Al Wurud vary greatly in building style and age, with some built conventionally and others more recent. Old concrete often shows hairline cracks at corners and openings, and may leak slowly around pipes. Newer pools may only need the basic waterproofing layer renewed before new tiles. Heat and seasonal changes accelerate problems in all cases. Photo messages help us assess whether the case is straightforward or needs deeper treatment.

  • Al Wurud is a district in the Eastern Province, near Al Wahah, As Sinaiyah and Ar Rawdah, with villas and apartment buildings.
  • A concrete pool endures varying water pressure year-round, so small cracks widen slowly unless treated before new tiles.
What the service includes

The scope of the work in Al Wurud (near Tarout)

  • Treating corners and pour joints with a suitable compound
  • Applying the waterproof layer across the floor, walls and pool rim
  • Inspecting the concrete and locating cracks and hairline cracks
  • Cleaning the surface and removing casting residue and dust
How we work

The steps of pool waterproofing before tiling in Al Wurud (near Tarout)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Pool waterproofing before tiling in Al Wurud (near Tarout)We choose the method and the materials once we know the condition of the spot.

We serve Al Wurud (near Tarout) and around itIncluding Al Wahah (near Qatif), As Sinaiyah (near Tarout) and Ar Rawdah (near Tarout), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing before tiling in Al Wurud (near Tarout)

Must the pool be completely drained before waterproofing?

Yes, the pool must be completely empty so we can inspect the concrete and properly treat cracks and joints. After treatment and complete drying, it is ready for new tiles.

Can we identify the leak location from photos?

Photos show cracks and damp patches that may indicate leaks, but the true location may not be clear until tiles are lifted. After thorough inspection we will tell you exactly where the leak occurs and how to treat it before new tiling.

Do you cover Al Wurud (near Tarout)?

Yes. We serve Al Wurud (near Tarout) and nearby areas such as Al Wahah (near Qatif), As Sinaiyah (near Tarout) and Ar Rawdah (near Tarout), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Nearby areas

Pool waterproofing before tiling near Al Wurud (near Tarout)

We also work near Al Wurud (near Tarout), in Al Wahah (near Qatif), As Sinaiyah (near Tarout) and Ar Rawdah (near Tarout).

Other services in the area

More services in Al Wurud (near Tarout)

Mosaic-tiled seaside pool

We start with you in Al Wurud (near Tarout)
with one call

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp