Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Waziyah

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Waziyah

Pool waterproofing before tiling in Al Waziyah begins with photos of the pool and concrete condition, sent by call or WhatsApp. Thorough treatment of concrete and cracks before tiling prevents future seepage and damp.

Al Waziyah is a residential district with villas and apartment buildings, many of which have private pools. Fresh concrete may contain small air voids and crack during drying due to heat. Corners, joints between floor and walls, and pipe openings are sensitive points requiring careful treatment before tiling. Photos show the actual concrete condition and any problems present before tiling begins.

  • Al Waziyah is a district in the Eastern Province, close to Al Mutayrifi, Ash Shuqayq and Julayjilah, with residential villas and apartment buildings.
  • Pools in residential areas need careful treatment before tiling because water remains in them continuously.
What the service includes

The pool waterproofing before tiling work in Al Waziyah

  • Inspecting the concrete and locating cracks and hairline cracks
  • Treating corners and pour joints with a suitable compound
  • Checking the layer is complete before tiling is allowed to begin
  • Cleaning the surface and removing casting residue and dust
How we work

This is how we work in Al Waziyah

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Al Waziyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Pool waterproofing before tiling in Al WaziyahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing before tiling in Al Waziyah

Does treating the pool before tiling require removing other elements?

That depends on the pool's condition. If filters or pipes are in place, we may need to move them temporarily. Send photos so we can determine what needs moving and what does not.

How do we know the concrete needs extra treatment before tiling?

Visible cracks, voids and damp are signs needing extra treatment. Photos clearly show these problems before work begins.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

What should I send you from Al Waziyah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Waziyah, and we will work out the next step with you.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Nearby areas

Pool waterproofing before tiling near Al Waziyah

Nearby areas we also cover: Al Mutayrifi, Ash Shuqayq and Julayjilah.

Other services in the area

More services in Al Waziyah

Mosaic-tiled seaside pool

We start with you in Al Waziyah
with one call

Describe the problem and where it is in Al Waziyah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp