Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Wayliyah

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Wayliyah

Pool waterproofing before tiling in Al Wayliyah begins with photos of the pool, concrete condition and joints sent by call or WhatsApp. All cracks and openings in the concrete shell are treated before tiling to achieve lasting protection from leaks.

Al Wayliyah is a small settlement with scattered villas and houses, and open land, with family pools in several properties. Fresh concrete needs surface treatment before tiling, as hairline cracks and small voids may not be visible but allow seepage. Joints between floor and walls and around pipe entries need special care because they are weak points. The dry climate causes concrete to shrink, widening small cracks. Photos reveal these defects before waterproofing begins.

  • Al Wayliyah is a small hamlet in the Eastern Province, close to As Sufayri, An Nahdah and An Nuzhah, with scattered houses spread across the area.
  • Joints in a new pool are where seepage starts if they are not waterproofed before tiling.
What the service includes

What the service covers in Al Wayliyah

  • Treating corners and pour joints with a suitable compound
  • Checking the layer is complete before tiling is allowed to begin
  • Applying the waterproof layer across the floor, walls and pool rim
  • Cleaning the surface and removing casting residue and dust
How we work

From first contact to the finished job in Al Wayliyah

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Start from Al Wayliyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Al Wayliyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in Al Wayliyah

Can a pool be tiled without treating the concrete first?

Not recommended. The pool holds water for years, and concrete needs protection before tiling. Send photos and we will assess the structure and tell you if treatment is needed.

How many times should a pool be inspected before waterproofing starts?

Photos you send are enough. If they clearly show the floor, walls and joints, we can assess the condition accurately and identify what needs treatment.

Is Al Wayliyah within your service area?

Yes, Al Wayliyah is one of the areas we work in, as are As Sufayri, An Nahdah (near Hafar Al-Batin) and An Nuzhah (near Hafar Al-Batin). To start, call us or message us on WhatsApp.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Nearby areas

Areas near Al Wayliyah

If the site is outside Al Wayliyah, the same service is available in As Sufayri, An Nahdah (near Hafar Al-Batin) and An Nuzhah (near Hafar Al-Batin).

Other services in the area

More services in Al Wayliyah

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Al Wayliyah?
Call us now

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp