Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Salmaniyah First District

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Salmaniyah First District

Pool waterproofing before tiling in Al Salmaniyah First District begins with a photo of the pool and its surroundings, sent by call or WhatsApp. The district mixes older and newer residential villas, each requiring different treatment for the pool before tiling.

Al Salmaniyah First District contains villas of varying ages and sizes, some older and some newer, with pools reflecting this mix. Older pools may have weaker floors and walls or multiple cracks, while newer ones have stronger concrete but still need preventive treatment before tiling. Proper treatment before adhesive and tiles go on prevents later leaks and preserves the structure. The photos you send let us choose the method suited to your pool's specific condition.

  • Al Salmaniyah First District is a residential district in the Eastern Province, close to Al Muhammadiyah District, Al Salmaniyah Second District and Ayn Najm District.
  • Older villas often have pool concrete affected by weather over time, requiring more thorough treatment before tiling.
What the service includes

What we do for you in Al Salmaniyah First District

  • Checking the layer is complete before tiling is allowed to begin
  • Treating corners and pour joints with a suitable compound
  • Applying the waterproof layer across the floor, walls and pool rim
  • Cleaning the surface and removing casting residue and dust
How we work

The stages of the work in Al Salmaniyah First District

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Pool waterproofing before tiling in Al Salmaniyah First DistrictWe choose the method and the materials once we know the condition of the spot.

Al Salmaniyah First District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Al Salmaniyah First District

Can an old pool be waterproofed without demolishing and rebuilding it?

In most cases yes, if the concrete is not severely broken. We treat cracks and joints, then apply waterproofing before tiling. Photos show us if more is needed.

How many times must the pool be inspected before waterproofing starts?

We start with photos and description by call or WhatsApp. Clear photos of key areas, corners, joints and pipe inlets, usually suffice to understand the condition and suggest the right approach.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Is Al Salmaniyah First District within your service area?

Yes, Al Salmaniyah First District is one of the areas we work in, as are Al Muhammadiyah District, Al Salmaniyah Second District and Ayn Najm District. To start, call us or message us on WhatsApp.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Nearby areas

We also offer it in neighbouring areas

We also offer pool waterproofing before tiling in Al Muhammadiyah District, Al Salmaniyah Second District and Ayn Najm District, among the closest areas to Al Salmaniyah First District.

Other services in the area

More services in Al Salmaniyah First District

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Al Salmaniyah First District?
Call us now

Describe the problem and where it is in Al Salmaniyah First District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp