Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Rehab

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Rehab

Pool waterproofing before tiling in Al Rehab starts with photos of the shell, corners and joints sent by call or WhatsApp. The district consists of modern residential villas, many with private pools requiring precise concrete treatment. We repair cracks, joints and pipe entries to prevent water leaks before tiles are laid.

Al Rehab is a district of modern villas and spacious residential homes, many with newly built or finishing private pools. New concrete is prone to shrinkage cracks, especially at corners and joints between walls and floor. Drainage and fill pipes need tight sealing to avoid leaks. Correct treatment before tiling saves time and money in the long run, and the photos show which cracks are present and how urgently they need repair.

  • Al Rehab is a residential district in the Eastern Province, near Umm as Sahik, Al Budur and Ad Duraydi.
  • Pools in modern villas may show cracks around joints and corners soon after the concrete is poured.
What the service includes

The pool waterproofing before tiling work in Al Rehab

  • Closing feed and drain pipe inlets and light fitting openings
  • Applying the waterproof layer across the floor, walls and pool rim
  • Cleaning the surface and removing casting residue and dust
  • Inspecting the concrete and locating cracks and hairline cracks
How we work

This is how we work in Al Rehab

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Your request from Al Rehab comes to usCall or WhatsApp on one number, and we answer you ourselves.

Al Rehab is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Al Rehab

What is the difference between treating a pool before and after tiling?

Pre-tiling treatment is easier, cheaper and more effective as the concrete is exposed. After tiling, cracks under the tiles are hard to reach, so treating problems from the start prevents later leaks.

Does all new concrete in pools need waterproofing before tiling?

Yes, treating concrete before tiling is necessary to achieve lasting waterproofing. Even small cracks can cause leaks over time, and photos reveal what needs repair.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

What should I send you from Al Rehab?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Rehab, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

We also offer pool waterproofing before tiling in Umm as Sahik, Al Budur and Ad Duraydi, among the closest areas to Al Rehab.

Other services in the area

More services in Al Rehab

Mosaic-tiled seaside pool

Tell us about your site in Al Rehab
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp