Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Oyun

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Oyun

Pool waterproofing before tiling in Al Oyun begins with photos of the shell, corners and joints sent by call or WhatsApp. The city has residential compounds and villas, many with private pools needing concrete treatment before final finishing.

Pools in Al Oyun are mainly in villas and modern or older residential compounds. Concrete under intense heat and seasonal changes cracks easily at joints and corners, and may leak around pipe entries. Treating the shell before tiling prevents costly seepage later and extends the pool's lifespan. Photos clarify the concrete's condition and what repair is needed.

  • Al Oyun is a city in the Eastern Province, near Al Marah, Al Awadiyah and Al Qarn, with residential buildings of varying age.
  • Concrete pools in harsh inland areas undergo strong expansion and contraction, causing stress cracks.
What the service includes

The pool waterproofing before tiling work in Al Oyun

  • Cleaning the surface and removing casting residue and dust
  • Checking the layer is complete before tiling is allowed to begin
  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
How we work

This is how we work in Al Oyun

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Al Oyun is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Al Oyun with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Oyun

Do you repair cracked pool shells before tiling in Al Oyun?

Yes, we repair cracks, joints and voids in the concrete. Send photos of the pool and any cracks, and we will determine with you the repairs needed to prevent water seeping under tiles.

When is the best time to treat a pool shell before tiling?

The concrete must be completely dry and the weather stable. If you plan to tile soon, send photos now so we can assess the shell and arrange a timeline with you.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Do you cover Al Oyun?

Yes. We serve Al Oyun and nearby areas such as Al Marah, Al Awadiyah and Al Qarn, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Nearby areas

The same service in nearby areas

If the site is outside Al Oyun, the same service is available in Al Marah, Al Awadiyah and Al Qarn.

Other services in the area

More services in Al Oyun

Mosaic-tiled seaside pool

Tell us about your site in Al Oyun
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp