Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Marwah

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Marwah

Pool waterproofing before tiling in Al Marwah starts with photos sent by call or WhatsApp. The district has residential villas with private pools varying in size and age, and concrete condition and joints differ from pool to pool.

Pools in Al Marwah sit in private villa yards, varying by build date and materials used. An older shell may show internal moisture or hairline cracks at corners, while a newer one may need only surface cleaning before lining. Intense summer heat stresses exposed concrete, and humidity can affect interior walls. Photos of the floor, walls, corners and pipe inlets determine the right treatment method.

  • Al Marwah is a district in the Eastern Province, close to Hazm, Al Safa and Ar Rabwah, with scattered residential villas.
  • A concrete pool faces daily hot sun and mineral water, so cracks and joints must be treated carefully before lining.
What the service includes

What the service covers in Al Marwah

  • Closing feed and drain pipe inlets and light fitting openings
  • Treating corners and pour joints with a suitable compound
  • Inspecting the concrete and locating cracks and hairline cracks
  • Checking the layer is complete before tiling is allowed to begin
How we work

This is how we work in Al Marwah

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Al Marwah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Marwah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Al Marwah

Can an old concrete pool in Al Marwah be treated?

Yes, if the base concrete is not severely damaged. We treat cracks and joints first then apply the right lining. Photos will tell us if the structure needs more extensive work.

How can I be sure the pool won't leak after treatment?

Proper treatment of cracks, joints and pipe inlets before lining is the foundation. After lining is done, you can fill the pool carefully and watch the walls and floor. Pre-tiling photos help understand the pool condition.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

What should I send you from Al Marwah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Marwah, and we will work out the next step with you.

Nearby areas

Areas near Al Marwah

Nearby areas we also cover: Hazm, Al Safa (near Safwa) and Ar Rabwah (near Safwa).

Other services in the area

More services in Al Marwah

Mosaic-tiled seaside pool

Tell us about your site in Al Marwah
and we will plan the next step with you

Describe the problem and where it is in Al Marwah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp