Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Khuzama (near Ghizlan)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Khuzama (near Ghizlan)

Pool waterproofing before tiling in Al Khuzama starts with photos of the basin and its corners, sent by call or WhatsApp. The district has houses, villas and home pools, and lining the basin before tiling is the step that protects the concrete from water.

The district is mostly houses and villas, with pools often built into gardens and outdoor spaces. Water can gather at corners and the floor if joints are not treated before tiling. Because each basin differs in age and shape, the photos determine what needs treatment before the right lining is chosen.

  • Al Khuzama is a residential district in the Eastern Province, close to Ar Rabwah, Al Salam and Al Rawdah.
  • The basin floor carries the full weight of the water, so the floor-to-wall joint is checked closely before tiling.
What the service includes

The main items of pool waterproofing before tiling in Al Khuzama (near Ghizlan)

  • Treating corners and pour joints with a suitable compound
  • Applying the waterproof layer across the floor, walls and pool rim
  • Cleaning the surface and removing casting residue and dust
  • Checking the layer is complete before tiling is allowed to begin
How we work

This is how we work in Al Khuzama (near Ghizlan)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Al Khuzama (near Ghizlan) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Khuzama (near Ghizlan) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing before tiling in Al Khuzama (near Ghizlan)

Does a new pool in Al Khuzama need waterproofing before tiling?

It is usually advisable, since a new basin needs lining before adhesive goes on. Send photos of the pool before tiling and we will confirm what is needed.

Do you treat the corners and the floor together?

Yes, the corners and the floor-to-wall joint are treated as part of the same work, and the photos set the limits of each section.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Is Al Khuzama (near Ghizlan) within your service area?

Yes, Al Khuzama (near Ghizlan) is one of the areas we work in, as are Ar Rabwah (near Ghizlan), Al Salam (near Ghizlan) and Al Rawdah (near Ghizlan). To start, call us or message us on WhatsApp.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Ar Rabwah (near Ghizlan), Al Salam (near Ghizlan) and Al Rawdah (near Ghizlan).

Other services in the area

More services in Al Khuzama (near Ghizlan)

Mosaic-tiled seaside pool

Tell us about your site in Al Khuzama (near Ghizlan)
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp