Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Jishshah

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Jishshah

Pool waterproofing before tiling in Al Jishshah starts with photos of the shell and its surroundings, sent by call or WhatsApp. The district has villas and residential buildings with private pools of varying size and construction, and the pool floor, walls and corners must be treated before tiling begins.

Al Jishshah comprises villas and residential buildings of varying sizes, each of which may contain a private pool. Older concrete pools in the district often show slight seepage from cracks around corners and joints, and newer pools may need surface treatment before tiling. Extreme heat in the dry area causes concrete to crack over time, and moisture inside the pool basin adds to these problems. Photos you send show the pool's condition clearly so we can decide the best treatment method with you.

  • Al Jishshah is a district in Al-Ahsa in the Eastern Province, close to Al Markaz, Al Jafr and As Sabat, with villas and residential buildings.
  • Bare concrete pools in dry areas crack from temperature changes, requiring careful treatment before tiling.
What the service includes

What the service covers in Al Jishshah

  • Inspecting the concrete and locating cracks and hairline cracks
  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
  • Checking the layer is complete before tiling is allowed to begin
How we work

The steps of pool waterproofing before tiling in Al Jishshah

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Al Jishshah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Al Jishshah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in Al Jishshah

Do you treat hairline cracks in Al Jishshah pools before tiling?

Yes, hairline cracks at corners and joints are common in pools, and we treat them before adhesive goes on. Send clear photos of the cracks so we can determine the best treatment for your case.

What do you do before tiling a new pool in Al Jishshah?

We test the concrete surface and check its soundness, treating any small cracks or weak joints. Then we apply waterproofing treatment before tiling starts, to ensure water does not seep into the concrete.

What should I send you from Al Jishshah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Jishshah, and we will work out the next step with you.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Nearby areas

Pool waterproofing before tiling near Al Jishshah

Nearby areas we also cover: Al Markaz, Al Jafr and As Sabat.

Other services in the area

More services in Al Jishshah

Mosaic-tiled seaside pool

Tell us about your site in Al Jishshah
and we will plan the next step with you

Describe the problem and where it is in Al Jishshah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp