Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Jabal

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Jabal

Pool waterproofing before tiling in Al Jabal starts with photos sent by call or WhatsApp. The district has houses and villas with gardens, many with small or medium pools in their yards that need their bases, corners and joints treated before tiles are laid.

Villas in Al Jabal range from older to newer, and their pools come in different sizes and depths. A concrete pool base often shows hairline cracks or weak joints where walls meet the floor, especially around water inlet and drain pipes. High heat and humidity in the area stress exposed concrete, so all cracks and gaps must be treated before tiling to create lasting waterproofing that supports the tiles. Photos accurately show the pool's state and guide the choice of treatment method.

  • Al Jabal is a residential district in the Eastern Province, close to Ad Dirah and Al Nakhil, with villas and houses that have yards and gardens.
  • A backyard pool faces both sun and humidity, so its base and corners must be waterproofed before any tile goes on.
What the service includes

The scope of the work in Al Jabal

  • Checking the layer is complete before tiling is allowed to begin
  • Cleaning the surface and removing casting residue and dust
  • Inspecting the concrete and locating cracks and hairline cracks
  • Applying the waterproof layer across the floor, walls and pool rim
How we work

This is how we work in Al Jabal

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Start from Al Jabal with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Al Jabal is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Jabal

Must a new pool in Al Jabal be waterproofed before tiling?

Yes, even a new pool needs its cracks and joints treated; they can form in concrete due to heat and drying. Send photos of the base, corners and pipes so we can assess what is needed.

How do you treat water pipes in a pool base before tiling?

We carefully waterproof the area around pipe entries and branches to prevent leaks. Photos help us understand the pipe layout and plan precisely before starting work.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

Do you offer pool waterproofing before tiling in Al Jabal?

Yes. Al Jabal is within our service area in the Eastern Province, and we also work in Ad Dirah, Al Nakhil (near Tarout) and Tarout. Call us or send photos of the spot on WhatsApp.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Nearby areas

The same service in nearby areas

We also offer pool waterproofing before tiling in Ad Dirah, Al Nakhil (near Tarout) and Tarout, among the closest areas to Al Jabal.

Other services in the area

More services in Al Jabal

Mosaic-tiled seaside pool

In Al Jabal and need pool waterproofing before tiling?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp