
Pool waterproofing before tiling in Al Iskan Second District
Pool waterproofing before tiling in Al Iskan Second District is planned from photos of the pool shell and its inlets, sent by call or on WhatsApp. The district sits close to Ar Rabiyah, Al Wurud Second and Al Danah, where most homes stand on residential plots. The photos set out the work needed before any tile adhesive is laid.
Al Iskan Second is built mostly on residential plots with family houses and a few villas, and a private pool usually sits in a side or back yard. Tiling is often renewed on its own without looking at the concrete shell underneath, yet water can find its way in through corners and edges. Where the wall meets the floor, and along the top edge of the pool, is where water most often gets behind a new finish. Whether the shell needs treating along with the tiles is something the photos will show.
- Al Iskan Second is a residential district in the Eastern Province, close to Ar Rabiyah District and Al Danah District.
- Old tiling laid over an unexamined shell can hide water that has been moving behind it for a long time.
The scope of the work in Al Iskan Second District
- Closing feed and drain pipe inlets and light fitting openings
- Applying the waterproof layer across the floor, walls and pool rim
- Cleaning the surface and removing casting residue and dust
- Treating corners and pour joints with a suitable compound
This is how we work in Al Iskan Second District
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Start from Al Iskan Second District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We serve Al Iskan Second District and around itIncluding Ar Rabiyah District, Al Wurud Second District and Al Danah District, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Common questions on pool waterproofing before tiling in Al Iskan Second District
Can I keep my existing tiles when the pool is waterproofed?
Sometimes, if the tiles are bonded firmly and the joints are sound, but tiles that sound hollow usually come off first. Send photos of the tile surface and any loose edges so we can see which case applies.
Does the pool need to be emptied before work starts?
The pool is usually emptied before the shell is prepared, and the drain level depends on what the photos reveal. Tell us whether it holds water now and how it is normally drained.
Does the surface have to be dry before the waterproof layer goes on?
It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.
Is Al Iskan Second District within your service area?
Yes, Al Iskan Second District is one of the areas we work in, as are Ar Rabiyah District, Al Wurud Second District and Al Danah District. To start, call us or message us on WhatsApp.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
What materials are used to waterproof a pool shell before tiling?
Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.
Areas near Al Iskan Second District
Nearby areas we also cover: Ar Rabiyah District, Al Wurud Second District and Al Danah District.
More services in Al Iskan Second District


