Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Hamra (near Ghizlan)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Hamra (near Ghizlan)

We treat pool basins in Al Hamra before adhesive and tiles go on, starting with a photo of the basin sent by call or WhatsApp. The treatment focuses on the concrete shell, basin corners, joints and pipe inlets before any decorative layer.

Al Hamra has residential streets close to the coast, and many villas there include back gardens where pools are built. Humidity from sea air keeps the shell damp for longer, which affects joints and corners. The photos reveal whether specific points need treatment or the whole shell needs lining before tiling.

  • Al Hamra is a residential district of Dammam in the Eastern Province, close to the sea, Al Salam and Ghirnatah.
  • Damp sea air keeps the shell wet, so joints are checked before any adhesive goes on.
What the service includes

What we do for you in Al Hamra (near Ghizlan)

  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
  • Inspecting the concrete and locating cracks and hairline cracks
  • Checking the layer is complete before tiling is allowed to begin
How we work

How we carry out pool waterproofing before tiling in Al Hamra (near Ghizlan)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Your request from Al Hamra (near Ghizlan) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Al Hamra (near Ghizlan) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in Al Hamra (near Ghizlan)

Does sea humidity affect pool waterproofing in Al Hamra?

Yes, humidity keeps the shell wet for longer, so joints and corners need checking before tiling. Send photos so we can identify the sensitive points in your basin.

Do you only treat joints on an older pool in Al Hamra?

Joint treatment may be enough if the shell is sound. The photos show whether the cracks are local or run through the shell, and we will tell you the outcome before any work.

Do you cover Al Hamra (near Ghizlan)?

Yes. We serve Al Hamra (near Ghizlan) and nearby areas such as Al Bahar (near Ghizlan), Al Salam (near Ghizlan) and Ghirnatah (near Ghizlan), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Nearby areas

Areas near Al Hamra (near Ghizlan)

Nearby areas we also cover: Al Bahar (near Ghizlan), Al Salam (near Ghizlan) and Ghirnatah (near Ghizlan).

Other services in the area

More services in Al Hamra (near Ghizlan)

Mosaic-tiled seaside pool

In Al Hamra (near Ghizlan) and need pool waterproofing before tiling?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp