Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Boweibiya

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Boweibiya

Retiling a pool in Al Boweibiya begins with photos of the existing shell, its edges and inlets, sent through call or WhatsApp. The village has an older centre with newer streets around it, and some pools are retiled over an existing finish, where the condition beneath decides the method.

Al Boweibiya combines older houses near its old town centre with newer homes on the edges, so pools range from long-built concrete shells to recent ones. Where a pool has been tiled before, the old finish can hide hollow sections, lifted edges or joint cracks that only show once it is opened up. The corners and pipe entries need particular care, since water tends to gather there. Photos of the current surface and the shell beneath show whether it can be treated in place or needs more preparation first.

  • Al Boweibiya is a village in the Eastern Province, close to Down Town, Ar Rafiah and Al Andalus.
  • Retiling over an old finish can hide defects, so the shell is checked before any new adhesive is placed.
What the service includes

What we do for you in Al Boweibiya

  • Applying the waterproof layer across the floor, walls and pool rim
  • Checking the layer is complete before tiling is allowed to begin
  • Closing feed and drain pipe inlets and light fitting openings
  • Cleaning the surface and removing casting residue and dust
How we work

From first contact to the finished job in Al Boweibiya

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Your request from Al Boweibiya comes to usCall or WhatsApp on one number, and we answer you ourselves.

Pool waterproofing before tiling in Al BoweibiyaWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Boweibiya

Can a pool be waterproofed over its old tiles?

Sometimes, if the old finish is firmly bonded and the shell beneath is sound. Photos of the tiles and any hollow or lifted areas show whether the old layer can stay or must come off first.

Do you treat older pools in Al Boweibiya?

Yes, we serve Al Boweibiya. Send photos of the pool, its edges and inlets through call or WhatsApp, and tell us how long the existing tiles have been in place so we understand their condition.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Is Al Boweibiya within your service area?

Yes, Al Boweibiya is one of the areas we work in, as are Down Town, Ar Rafiah and Al Andalus (near Ar Rafiah). To start, call us or message us on WhatsApp.

Nearby areas

Pool waterproofing before tiling near Al Boweibiya

We also offer pool waterproofing before tiling in Down Town, Ar Rafiah and Al Andalus (near Ar Rafiah), among the closest areas to Al Boweibiya.

Other services in the area

More services in Al Boweibiya

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Al Boweibiya?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp