Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Bawadi

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Bawadi

Pool waterproofing before tiling in Al Bawadi begins with a photo of the shell, its corners and pipe openings, sent by call or WhatsApp. The district has apartment blocks and houses of various sizes, and its pools need careful treatment before tiling.

Pools in Al Bawadi vary by building age and materials used. Older shells often show cracks or damp on the floor and walls before tiling, while newer ones may need work on drainage pipes and corners. Coastal humidity and summer heat speed concrete decay if not properly treated. Inspecting photos reveals cracks and potential leaks to choose the right method.

  • Al Bawadi is a district in the Eastern Province, close to Al Jumaimah, Ar Rif and Al Awwamiyah, with apartment blocks and residential houses.
  • Swimming pools in older buildings often suffer chronic leaks at corners and joints before tiles are laid.
What the service includes

What the service covers in Al Bawadi

  • Cleaning the surface and removing casting residue and dust
  • Treating corners and pour joints with a suitable compound
  • Applying the waterproof layer across the floor, walls and pool rim
  • Inspecting the concrete and locating cracks and hairline cracks
How we work

How we carry out pool waterproofing before tiling in Al Bawadi

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Start from Al Bawadi with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Al Bawadi and around itIncluding Al Jumaimah, Ar Rif and Al Awwamiyah, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Bawadi

Should a leaking pool in Al Bawadi be inspected before waterproofing?

Yes, absolutely. Send photos of where the leak is and tell us whether it is from the wall or floor so we can address the cause first, then apply the waterproof layer.

How does coastal humidity affect a pool shell before tiling?

Humidity deepens small cracks in concrete and weakens it. Treating these cracks and drying the surface before tiling helps ensure the waterproof layer adheres properly and protects the pool.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Do you offer pool waterproofing before tiling in Al Bawadi?

Yes. Al Bawadi is within our service area in the Eastern Province, and we also work in Al Jumaimah, Ar Rif and Al Awwamiyah. Call us or send photos of the spot on WhatsApp.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

Nearby areas

We also offer it in neighbouring areas

We also offer pool waterproofing before tiling in Al Jumaimah, Ar Rif and Al Awwamiyah, among the closest areas to Al Bawadi.

Other services in the area

More services in Al Bawadi

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Al Bawadi?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp