
Pool waterproofing before tiling in Al Aziziyah (near Sayhat)
Pool waterproofing before tiling in Al Aziziyah starts with photos of the new concrete shell, every joint and opening, sent by call or WhatsApp. The district has villas and apartment blocks with varied pools, and fresh concrete needs careful treatment before tiling.
Al Aziziyah spreads across villas with large yards and apartment blocks, each possibly holding a different-sized pool. Fresh concrete in such buildings often has hairline cracks in corners and around pipe inlets, especially if exposed to direct sun before treatment. Wall-to-floor joints are critical leak areas. Thorough treatment before tiling protects against long-term dampness problems. We ask for clear photos from inside and outside the pool for a thorough assessment.
- Al Aziziyah is a residential district in the Eastern Province, near Al Jawharah, Al Anud and Al Buhayrah, with villas and apartment blocks.
- The gap between a drain pipe and the concrete around its opening is a common slow-leak point in new pools.
The scope of the work in Al Aziziyah (near Sayhat)
- Closing feed and drain pipe inlets and light fitting openings
- Applying the waterproof layer across the floor, walls and pool rim
- Treating corners and pour joints with a suitable compound
- Checking the layer is complete before tiling is allowed to begin
The stages of the work in Al Aziziyah (near Sayhat)
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Pool waterproofing before tiling in Al Aziziyah (near Sayhat)We choose the method and the materials once we know the condition of the spot.
We serve Al Aziziyah (near Sayhat) and around itIncluding Al Jawharah (near Sayhat), Al Anud and Al Buhayrah (near Sayhat), as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on pool waterproofing before tiling in Al Aziziyah (near Sayhat)
Do we need to drain the pool before treatment?
Yes, the pool must be empty and dry before treatment. Concrete must be clean of dirt and dust. Tell us when it will be ready and we will advise on drying time needed.
Do we treat the pool before the pump and filtration system is switched on?
Yes, treatment happens before the pool is filled or any system switched on. After treatment and tiling, the pool can be filled and the pump started. Tell us your fill schedule so we can plan with you.
Do you cover Al Aziziyah (near Sayhat)?
Yes. We serve Al Aziziyah (near Sayhat) and nearby areas such as Al Jawharah (near Sayhat), Al Anud and Al Buhayrah (near Sayhat), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
What materials are used to waterproof a pool shell before tiling?
Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.
How long must the waterproof layer cure before tiles go on?
It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.
The same service in nearby areas
We also work near Al Aziziyah (near Sayhat), in Al Jawharah (near Sayhat), Al Anud and Al Buhayrah (near Sayhat).
More services in Al Aziziyah (near Sayhat)


