Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Awjam

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Awjam

Pool waterproofing before tiling in Al Awjam starts with photos of the shell, its corners and pipe inlets, sent by call or WhatsApp. The town is quiet with scattered homes, and its pools vary in size and age.

Al Awjam is a town of mostly spaced-out homes, and pools there are often built in the back yard. An older concrete shell usually shows hairline cracks in the corners and at wall joints, and these spots need treating before tile adhesive goes on. Intense heat on exposed surfaces adds to the movement of the concrete. The photos show what your pool needs before the waterproofing method is set.

  • Al Awjam is a town in the Eastern Province, close to the Al Badi and Al Mashtal areas, with mostly spaced-out homes.
  • The inside corner of a pool is the spot most prone to cracking, since stress gathers there with each expansion.
What the service includes

The scope of the work in Al Awjam

  • Cleaning the surface and removing casting residue and dust
  • Applying the waterproof layer across the floor, walls and pool rim
  • Closing feed and drain pipe inlets and light fitting openings
  • Treating corners and pour joints with a suitable compound
How we work

The steps of pool waterproofing before tiling in Al Awjam

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

We serve Al Awjam and around itIncluding Al Aujam, Al Badi (near Al Awjam) and Al Mashtal, as part of our work across the Eastern Province.

Al Awjam is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Al Awjam

Are the inside corners of an older pool in Al Awjam treated?

Yes, corners are among the most important spots in the work. They are checked from the photos first, then cracks are treated before the waterproofing and tile adhesive go on.

Do you serve private pools in Al Awjam?

Yes, we serve Al Awjam. Send photos of the pool and tell us where it sits in the yard, so we can agree on access and the work before starting.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

What should I send you from Al Awjam?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Awjam, and we will work out the next step with you.

Nearby areas

Pool waterproofing before tiling near Al Awjam

Nearby areas we also cover: Al Aujam, Al Badi (near Al Awjam) and Al Mashtal.

Other services in the area

More services in Al Awjam

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Al Awjam?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp