
Pool waterproofing before tiling in Al Athir
Pool waterproofing before tiling in Al Athir begins with a photo sent via WhatsApp or a call. The district has villas and apartment buildings of varying sizes, many with private pools that need their concrete and joints carefully treated.
Pools in Al Athir are built from concrete of different ages, showing hairline cracks and leaks around corners and intake holes. Intense summer heat stresses the surface and opens the pores, and seasonal humidity increases leak risk. The shell's condition must be checked before choosing a waterproofing method, and all cracks and joints are treated to ready them for tile. Photos show where the problem is and how large it is.
- Al Athir is a residential district in Al Ahsa in the Eastern Province, bordered by Ad Dabab, Al Jalawiyah and Al Qadisiyah.
- Joints between a pool's floor and walls and around pipes are the weakest leak points in concrete pools.
The pool waterproofing before tiling work in Al Athir
- Closing feed and drain pipe inlets and light fitting openings
- Applying the waterproof layer across the floor, walls and pool rim
- Inspecting the concrete and locating cracks and hairline cracks
- Treating corners and pour joints with a suitable compound
From first contact to the finished job in Al Athir
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Start from Al Athir with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Al Athir comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about pool waterproofing before tiling in Al Athir
Can a pool be waterproofed without removing old tiles in Al Athir?
That depends on the tile and concrete condition underneath. Send clear photos of the pool and any cracks or dampness you see, and we will decide with you whether removal is needed.
Will waterproofing delay when you can use the pool again in Al Athir?
Yes, there is time between treatment, tiling and final drying. Photos help us estimate the time needed based on your concrete's condition and the right waterproofing method.
Is Al Athir within your service area?
Yes, Al Athir is one of the areas we work in, as are Ad Dabab (near Al Athir), Al Jalawiyah and Al Qadisiyah. To start, call us or message us on WhatsApp.
Why is the pool shell waterproofed before tiling and not after?
Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.
How long must the waterproof layer cure before tiles go on?
It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.
Does the surface have to be dry before the waterproof layer goes on?
It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.
Pool waterproofing before tiling near Al Athir
We also work near Al Athir, in Ad Dabab (near Al Athir), Al Jalawiyah and Al Qadisiyah.
More services in Al Athir

