Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Ad Dabab (near Dammam)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Ad Dabab (near Dammam)

Pool waterproofing before tiling in Ad Dabab starts with photos sent to us by call or WhatsApp. Pools in this coastal district near the port need special treatment of the concrete shell and joints before tile adhesive and tiles are applied.

Ad Dabab has diverse houses and villas, some newer and some older, with private residential pools. New concrete may only need cleaning and fine crack repair, while older concrete often shows bigger cracks at corners, joints and pipe inlets. Coastal humidity and intense heat affect the concrete surface, and photos reveal the pool's actual condition before any treatment is chosen.

  • Ad Dabab is a district in the Eastern Province near King Abdul Aziz Seaport and Al Mazruiyah.
  • Concrete joints and corners at the pool floor are the points most prone to leaks before tiling.
What the service includes

The scope of the work in Ad Dabab (near Dammam)

  • Applying the waterproof layer across the floor, walls and pool rim
  • Closing feed and drain pipe inlets and light fitting openings
  • Treating corners and pour joints with a suitable compound
  • Inspecting the concrete and locating cracks and hairline cracks
How we work

The stages of the work in Ad Dabab (near Dammam)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Pool waterproofing before tiling in Ad Dabab (near Dammam)We choose the method and the materials once we know the condition of the spot.

Start from Ad Dabab (near Dammam) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ad Dabab (near Dammam)

Must old concrete be removed from a pool in Ad Dabab before waterproofing?

Not always. If the concrete structure is sound, cracks, joints and pipes are repaired first, then waterproofing is applied. Photos will show whether deeper work is needed.

How long does pool waterproofing take in a coastal area before tiling?

It depends on the pool's size, concrete condition and number of cracks and joints. Send clear photos and we will tell you what the case needs.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Is Ad Dabab (near Dammam) within your service area?

Yes, Ad Dabab (near Dammam) is one of the areas we work in, as are King Abdul Aziz Seaport, Al Mazruiyah and At Tubayshi. To start, call us or message us on WhatsApp.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Nearby areas

The same service in nearby areas

We also work near Ad Dabab (near Dammam), in King Abdul Aziz Seaport, Al Mazruiyah and At Tubayshi.

Other services in the area

More services in Ad Dabab (near Dammam)

Mosaic-tiled seaside pool

We start with you in Ad Dabab (near Dammam)
with one call

Describe the problem and where it is in Ad Dabab (near Dammam), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp