Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Utayyiq

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Utayyiq

We treat leaks in tiled pools in Utayyiq by locating the source first, then sealing joints, cracks and fittings. Send a photo of the pool and where the water is lost by call or WhatsApp to begin the diagnosis.

Utayyiq is a small village of scattered houses and private farms, and a pool may sit well away from the house in the yard or orchard. Tiled pools here usually leak at the tile joints around the edge and where the pool meets the ground, and the loss shows more clearly when the water level changes. The location of a leak is confirmed by inspection, not guessed.

  • Utayyiq is a small village in the Eastern Province, close to Al Husayy, Nita and Mulayjah, with scattered houses and farms.
  • Water lost at the edge or into the surrounding ground can look like a basin leak, so its position needs checking.
What the service includes

The scope of the work in Utayyiq

  • Watching the water level after filling to confirm the leak is closed
  • Lifting damaged tiles and rebuilding the layer behind them where needed
  • Closing pump, light and return fittings from inside
  • Testing the leak area with dye and pressure-checking the lines
How we work

The stages of the work in Utayyiq

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.

We serve Utayyiq and around itIncluding Al Husayy, Nita and Mulayjah, as part of our work across the Eastern Province.

Utayyiq is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing after tiling in Utayyiq

Do you treat pools on private farms in Utayyiq?

Yes, we serve Utayyiq. Send photos of the pool and where it sits in the yard or orchard, and tell us how access is arranged, so we can plan the inspection with you.

How can I tell if the lost water is a real leak in Utayyiq?

Track the water level for a few days with the pump off and evaporation kept in mind, and photograph the tiles and the edge. These notes are enough for an initial distinction before on-site inspection.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

Do you cover Utayyiq?

Yes. We serve Utayyiq and nearby areas such as Al Husayy, Nita and Mulayjah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How do I know my pool is leaking and not just evaporating?

Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Husayy, Nita and Mulayjah.

Other services in the area

More services in Utayyiq

Pool at night with water jets after waterproofing

Pool waterproofing after tiling in Utayyiq?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp