Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Maaqla

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Maaqla

In Maaqla we treat tiled pools that are losing water by identifying the source, then closing the joints, cracks and fittings. Send photos of the pool by call or WhatsApp to define the case.

Maaqla is a village of houses and villas, close to government sites, and its pools are generally in the yards of widely spaced villas. Exposed pools here face intense summer heat, and the gap between day and night temperatures moves the joints over time. The photos reveal where the leak begins before any work is done.

  • Maaqla is a village in the Eastern Province, close to Al Boweibiya, Sihmah and the government departments.
  • High heat makes tiles expand and contract, so grout lines are usually the first to move.
What the service includes

The pool waterproofing after tiling work in Maaqla

  • Lifting damaged tiles and rebuilding the layer behind them where needed
  • Closing pump, light and return fittings from inside
  • Resealing joints with a flexible water-resistant compound
  • Testing the leak area with dye and pressure-checking the lines
How we work

From first contact to the finished job in Maaqla

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.

Pool waterproofing after tiling in MaaqlaWe choose the method and the materials once we know the condition of the spot.

Your request from Maaqla comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing after tiling in Maaqla

Can intense heat really cause a pool to leak?

Heat moves the tiles and joints, and repeated expansion and contraction can crack the grout. That does not always mean heat is the sole cause, and the photos will show the actual form of the fault.

Does the pool need to be emptied before treatment?

That depends on where the leak is and the size of the work. Tell us how you use the pool when you send the photos and we will confirm what is needed.

How do I request pool waterproofing after tiling in Maaqla?

Call us, or send clear photos of the spot and its location in Maaqla on WhatsApp, and we will work out the next step with you.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

What is the difference between resealing joints and injecting cracks in a pool?

A joint is the line between two tiles or between a tile and a fitting, and it is resealed with a flexible water-resistant compound that tolerates shell movement. A crack is a break in the concrete or render behind the tile, and it is injected with a compound that fills the void and stops it spreading. The source determines which treatment is used.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

Nearby areas

Areas near Maaqla

We also offer pool waterproofing after tiling in Al Boweibiya, Sihmah and Government Departments (near Umm al Hawshat), among the closest areas to Maaqla.

Other services in the area

More services in Maaqla

Pool at night with water jets after waterproofing

In Maaqla and need pool waterproofing after tiling?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp