Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Industrial (near Al Khafji)

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Industrial (near Al Khafji)

In the Industrial area we treat leaks in tiled pools linked to facilities and compounds, locating the source first and then sealing joints, cracks and fittings. Send photos of the pool by call or WhatsApp to begin the assessment.

The Industrial area contains a range of buildings and facilities, and its pools are often in shared amenities or dedicated compounds, sometimes large and heavily used. In large tiled pools leaks recur along long grout runs and at water inlets and outlets, and the work may need to be done in separate stages. The actual leak points are therefore established first, to avoid treatment that achieves nothing.

  • The Industrial area lies in Al-Ahsa in the Eastern Province, near At Taawun, Al Luluah and An Nahdah.
  • Shared pools see heavy traffic, and their grout is affected by constant use more than private pools.
What the service includes

What the service covers in Industrial (near Al Khafji)

  • Watching the water level after filling to confirm the leak is closed
  • Injecting cracks with a compound suited to the concrete shell
  • Lifting damaged tiles and rebuilding the layer behind them where needed
  • Testing the leak area with dye and pressure-checking the lines
How we work

This is how we work in Industrial (near Al Khafji)

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.

Industrial (near Al Khafji) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Industrial (near Al Khafji) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing after tiling in Industrial (near Al Khafji)

Can a large pool be treated in stages?

Yes, in most cases. The work is divided by the identified leak positions, and the photos and diagnosis show which sections need treatment first.

What should we know about a shared pool?

The approximate dimensions of the pool, the tile type, where the water inlets and outlets are, and any drops in level you have noticed. These details help identify leak positions before we reach them.

Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?

In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

Is Industrial (near Al Khafji) within your service area?

Yes, Industrial (near Al Khafji) is one of the areas we work in, as are At Taawun (near Al Khafji), Al Luluah and An Nahdah (near Al Khafji). To start, call us or message us on WhatsApp.

How do I know my pool is leaking and not just evaporating?

Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.

Nearby areas

We also offer it in neighbouring areas

We also offer pool waterproofing after tiling in At Taawun (near Al Khafji), Al Luluah and An Nahdah (near Al Khafji), among the closest areas to Industrial (near Al Khafji).

Other services in the area

More services in Industrial (near Al Khafji)

Pool at night with water jets after waterproofing

In Industrial (near Al Khafji) and need pool waterproofing after tiling?
Send us photos of the spot

Describe the problem and where it is in Industrial (near Al Khafji), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp