Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Az Zuhur (near Qaryah al Ulya)

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Az Zuhur (near Qaryah al Ulya)

Pool waterproofing after tiling in Az Zuhur starts with WhatsApp photos showing where water escapes and its surroundings. The district consists of villas and apartment buildings, many villas with private pools at risk of leaks from cracked tiles or crumbling joints.

Private pools in Az Zuhur are mostly surrounded by brick and concrete walls, with coloured tiles on walls and floor subjected to temperature fluctuations over years. Water leaks where tiles crack or joints between them fail, or around pump and drain openings. If water enters the wall it dampens the pool's structure and weakens it. We need clear photos of the leak location and surrounding damp areas to determine the best solution.

  • Az Zuhur is a district in the Eastern Province, close to Qaryah al Ulya, Al Muruj and Ar Rawdah.
  • Tile in a private pool faces dual pressure from heat and water, and leaks may start from hairline cracks invisible to the eye.
What the service includes

What we do for you in Az Zuhur (near Qaryah al Ulya)

  • Closing pump, light and return fittings from inside
  • Resealing joints with a flexible water-resistant compound
  • Watching the water level after filling to confirm the leak is closed
  • Testing the leak area with dye and pressure-checking the lines
How we work

The stages of the work in Az Zuhur (near Qaryah al Ulya)

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.

Start from Az Zuhur (near Qaryah al Ulya) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Pool waterproofing after tiling in Az Zuhur (near Qaryah al Ulya)We choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing after tiling in Az Zuhur (near Qaryah al Ulya)

Does dampness in the pool's outer walls after standing idle mean there is a leak?

Usually yes. If the pool is closed and unused yet the outer walls are damp, this points to an internal leak. Send photos of the damp areas and the whole pool's location so we can help you pinpoint it.

Can crumbling pool joints be repaired without a long shutdown?

This depends on how deep the damage is and how many joints are affected. Some joints may be treated while the pool is in use or with a brief shutdown, but if damage is widespread, longer downtime may be needed. The photos will show us what is possible.

What should I send you from Az Zuhur (near Qaryah al Ulya)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Az Zuhur (near Qaryah al Ulya), and we will work out the next step with you.

How do I know my pool is leaking and not just evaporating?

Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Qaryah al Ulya, Al Muruj (near Qaryah al Ulya) and Ar Rawdah (near Qaryah al Ulya).

Other services in the area

More services in Az Zuhur (near Qaryah al Ulya)

Pool at night with water jets after waterproofing

Tell us about your site in Az Zuhur (near Qaryah al Ulya)
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp