Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Ash Shweikah

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Ash Shweikah

Pool waterproofing after tiling in Ash Shweikah starts when you send a photo of the pool and leak evidence by call or WhatsApp. The district has villas and residential buildings with private pools exposed to harsh heat and humidity.

Private pools in Ash Shweikah are in villa courtyards or apartment gardens, concrete-built and tiled inside. Leaks may appear in tile joints, around pipes and fittings, or from cracks under the tiles. Heat and humidity weaken mortar and joints over time, and pool conditions can differ greatly. Photos clearly show location and damage so we choose the right method.

  • Ash Shweikah is a district in the Eastern Province, near Al Masudiyah, Kuwaikib and Al Wadiah.
  • Joints and seams between pool tiles gradually deteriorate when wetness and dryness alternate due to heat and humidity.
What the service includes

The pool waterproofing after tiling work in Ash Shweikah

  • Resealing joints with a flexible water-resistant compound
  • Testing the leak area with dye and pressure-checking the lines
  • Closing pump, light and return fittings from inside
  • Watching the water level after filling to confirm the leak is closed
How we work

This is how we work in Ash Shweikah

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.

Ash Shweikah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Ash Shweikah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing after tiling in Ash Shweikah

Is fixing an old leak in a Ash Shweikah pool complicated?

Not necessarily. Old damage may be localized and easy to fix, but sometimes it goes deeper. Photos show damage extent and we advise what suits your pool's condition.

Do intense heat and humidity speed damage to Ash Shweikah pools?

Yes, extreme heat and ongoing humidity weaken mortar and tiles. This raises leak risk, and effective waterproofing protects the pool from these effects.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

What decides the cost of waterproofing a pool after tiling?

The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

How do I know my pool is leaking and not just evaporating?

Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.

What should I send you from Ash Shweikah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ash Shweikah, and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Ash Shweikah, the same service is available in Al Masudiyah, Kuwaikib and Al Wadiah.

Other services in the area

More services in Ash Shweikah

Pool at night with water jets after waterproofing

Tell us about your site in Ash Shweikah
and we will plan the next step with you

Call us or send photos of the pool and any suspect areas on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp