Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Ash Shamiyah

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Ash Shamiyah

Pool waterproofing after tiling in Ash Shamiyah starts with photos of the pool sent by call or WhatsApp. The village has villas and small buildings among open areas, with several pools serving families and groups. Identifying the leak source is essential before treating joints and cracks.

Pools in Ash Shamiyah range from older basins to newer ones, and extreme heat plus humid air stresses every floor and wall. Tiles and cement joints shift with temperature changes, so cracks appear around pump and drain openings. Photos clearly show the leak pattern and location, helping to choose the right treatment.

  • Ash Shamiyah is a village in the Eastern Province, near Ash Shihiyah and Al Wahah, with houses and small buildings.
  • Tile joints around the pool perimeter face constant pressure from water and heat, making them common leak points.
What the service includes

The pool waterproofing after tiling work in Ash Shamiyah

  • Watching the water level after filling to confirm the leak is closed
  • Resealing joints with a flexible water-resistant compound
  • Testing the leak area with dye and pressure-checking the lines
  • Lifting damaged tiles and rebuilding the layer behind them where needed
How we work

This is how we work in Ash Shamiyah

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.

We serve Ash Shamiyah and around itIncluding Ash Shihiyah, Al Wahah (near Ash Shihiyah) and Al Majd, as part of our work across the Eastern Province.

Your request from Ash Shamiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing after tiling in Ash Shamiyah

Is the leak from the pool floor or the walls in Ash Shamiyah?

Photos from all angles reveal this. We look for damp spots around joints and fine cracks, and check for water flowing or seeping slowly. The photos pinpoint the location before we plan the treatment.

How long does it take to treat the joints of a tiled pool?

That depends on how many cracks there are, where they are, and what material is used. The photos help us estimate the time better once we understand the full situation.

Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?

In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

What should I send you from Ash Shamiyah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ash Shamiyah, and we will work out the next step with you.

How do I know my pool is leaking and not just evaporating?

Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.

Nearby areas

Areas near Ash Shamiyah

We also work near Ash Shamiyah, in Ash Shihiyah, Al Wahah (near Ash Shihiyah) and Al Majd.

Other services in the area

More services in Ash Shamiyah

Pool at night with water jets after waterproofing

Pool waterproofing after tiling in Ash Shamiyah?
Call us now

Call us or send photos of the pool and any suspect areas on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp