Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Ar Rida

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Ar Rida

Pool waterproofing after tiling in Ar Rida begins with a WhatsApp message containing photos of the pool and where it leaks. Ar Rida is a residential district with villas and apartment buildings, many of its newer homes having private pools that are covered or open.

Ar Rida mixes newer villas and apartment buildings, many of whose pools are recently designed with well-finished tiling at first. Yet flowing water and constant pressure break down adhesive over time, fine cracks appear at corners and joints due to concrete movement and intense heat. Dampness and humidity around foundations can affect a pool built partly below ground. Photos show the state of tile and mortar before choosing a focused or broader repair.

  • Ar Rida is a residential district in the Eastern Province, close to Al Wahah, Al Khuzama and Ash Shati.
  • Pools built partly below ground face moisture pressure from surrounding foundations, affecting tiles and joints.
What the service includes

What we do for you in Ar Rida

  • Injecting cracks with a compound suited to the concrete shell
  • Resealing joints with a flexible water-resistant compound
  • Lifting damaged tiles and rebuilding the layer behind them where needed
  • Watching the water level after filling to confirm the leak is closed
How we work

The stages of the work in Ar Rida

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.

Pool waterproofing after tiling in Ar RidaWe choose the method and the materials once we know the condition of the spot.

Your request from Ar Rida comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ar Rida

Why do cracks appear in tiles of a relatively new pool in Ar Rida?

Intense daytime heat and cool nights cause concrete to expand and contract; adhesive weakens from constant water and pressure. Photos show crack severity and location, and we determine with you whether local repair is enough.

Do you treat covered pools or pools under domes in Ar Rida?

Yes, we serve all pool types in Ar Rida. Send clear photos from inside and outside showing how water escapes or dampness gathers, and we will plan access and treatment with you.

What is the difference between resealing joints and injecting cracks in a pool?

A joint is the line between two tiles or between a tile and a fitting, and it is resealed with a flexible water-resistant compound that tolerates shell movement. A crack is a break in the concrete or render behind the tile, and it is injected with a compound that fills the void and stops it spreading. The source determines which treatment is used.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

Do you offer pool waterproofing after tiling in Ar Rida?

Yes. Ar Rida is within our service area in the Eastern Province, and we also work in Al Wahah (near Qatif), Al Khuzama (near Qatif) and Ash Shati (near Tarout). Call us or send photos of the spot on WhatsApp.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

Nearby areas

Pool waterproofing after tiling near Ar Rida

Nearby areas we also cover: Al Wahah (near Qatif), Al Khuzama (near Qatif) and Ash Shati (near Tarout).

Other services in the area

More services in Ar Rida

Pool at night with water jets after waterproofing

Your first step in Ar Rida:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp