Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in An Nasriyah District

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in An Nasriyah District

We treat leaks in tiled pools in An Nasriyah District in Hofuf, starting by locating the source. The district sits within Hofuf's older fabric, where pools may be set in courtyards and closely spaced houses that limit access.

An Nasriyah is made of closely built houses and mid-sized buildings, and a pool there is often in a narrow back courtyard. Leaks usually begin at the joints between tiles and at the water inlet and filter after retiling. We identify the position from the photos before any work starts.

  • An Nasriyah is a residential district of Hofuf in Al-Ahsa, close to the historical centre and the As Sulaimaniyah and As Salhiyah districts.
  • In a narrow courtyard limited space makes the filter and drains harder to reach, so the photos determine what is accessible.
What the service includes

The main items of pool waterproofing after tiling in An Nasriyah District

  • Closing pump, light and return fittings from inside
  • Testing the leak area with dye and pressure-checking the lines
  • Lifting damaged tiles and rebuilding the layer behind them where needed
  • Watching the water level after filling to confirm the leak is closed
How we work

How we carry out pool waterproofing after tiling in An Nasriyah District

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.

An Nasriyah District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from An Nasriyah District comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing after tiling in An Nasriyah District

Can a pool in a narrow courtyard in An Nasriyah be treated?

Often yes, provided the joints and fittings can be reached. Space is judged from the photos, and we will tell you if any limit affects the method.

What causes leaks after retiling a pool in Hofuf?

Usually joints not treated before tiling, cracks in the original lining, or an inlet that is not sealed. The photos show which of these applies to your case.

What should I send you from An Nasriyah District?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in An Nasriyah District, and we will work out the next step with you.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

What decides the cost of waterproofing a pool after tiling?

The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Nearby areas

We also offer it in neighbouring areas

If the site is outside An Nasriyah District, the same service is available in Historical Center Hafuf District, As Sulaimaniyah District and As Salhiyah District.

Other services in the area

More services in An Nasriyah District

Pool at night with water jets after waterproofing

Tell us about your site in An Nasriyah District
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp