
Pool waterproofing after tiling in Al Yamamah
Pool waterproofing after tiling in Al Yamamah begins with photos sent by call or WhatsApp. The district has villas and private homes where the pool usually sits in a private yard or garden, and leaks show up around the tiles and joints when soil stays damp around the pool base.
Pools in villas across Al Yamamah face intense sun all day and soil around the edge stays damp, so tiles crack and joints lose their seal over time. The leak may be directly under the tiles, from drain lines or from the pool floor itself. We need clear photos from inside and outside the pool and a general view to pinpoint the leak before choosing how to seal and waterproof it.
- Al Yamamah is a district in the Eastern Province near Ad Dirah, Az Zomorod and Al Nakhil, with villas and residential buildings.
- A pool exposed to direct sun suffers repeated expansion and contraction in tiles and grout, causing small cracks that widen with moisture.
What the service covers in Al Yamamah
- Lifting damaged tiles and rebuilding the layer behind them where needed
- Watching the water level after filling to confirm the leak is closed
- Resealing joints with a flexible water-resistant compound
- Closing pump, light and return fittings from inside
From first contact to the finished job in Al Yamamah
Send photos of the pool
On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.
Locate the source of the leak
A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.
Treat the leak point
Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.
Verify and cure
After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.
Why Abraj Al Azl?
Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.
Pool waterproofing after tiling in Al YamamahWe choose the method and the materials once we know the condition of the spot.
Your request from Al Yamamah comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Yamamah
How do you locate the leak source in a fully tiled pool?
The photos clearly show where moisture appears around and inside the pool, and we examine the tiles, joints and visible pipes. We may need closer inspection if the photos are not enough, but we start by reading them first.
Does waterproofing a tiled pool mean removing the tiles?
Not always. If cracks are only in the joints and grout, we seal and waterproof them without lifting the tiles. If the damage goes deeper or the tiles themselves are badly cracked, the photos will show it and we will tell you what is actually needed.
What decides the cost of waterproofing a pool after tiling?
The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.
How do I request pool waterproofing after tiling in Al Yamamah?
Call us, or send clear photos of the spot and its location in Al Yamamah on WhatsApp, and we will work out the next step with you.
How do I know my pool is leaking and not just evaporating?
Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.
Does the pool have to be emptied before the leak is found?
Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.
We also offer it in neighbouring areas
We also work near Al Yamamah, in Ad Dirah, Az Zomorod and Al Nakhil (near Tarout).
More services in Al Yamamah


