Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Al Uqayr

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Al Uqayr

Pool waterproofing after tiling in Al Uqayr starts with a photo of the pool and leak location, sent by call or WhatsApp. The village has homes and villas with private pools, where leaks often appear in joints or under the tiles when exposed to heat and moisture.

In Al Uqayr, homes and villas with pools face a particular challenge: new tiling may conceal old waterproofing faults, and water finds its way through fine cracks and joints. Intense summer heat speeds the expansion and contraction of tiles and concrete, opening new cracks. Coastal humidity raises pressure on the materials. A photo of the pool and where dampness appears shows where to find the real source before treatment begins.

  • Al Uqayr is a village in the Eastern Province, close to Al Durra and Al Aqiq, with homes and villas that have gardens and outbuildings.
  • Flexible tiling and good joints protect a pool, but intense heat and age gradually weaken both.
What the service includes

The main items of pool waterproofing after tiling in Al Uqayr

  • Watching the water level after filling to confirm the leak is closed
  • Lifting damaged tiles and rebuilding the layer behind them where needed
  • Resealing joints with a flexible water-resistant compound
  • Testing the leak area with dye and pressure-checking the lines
How we work

The steps of pool waterproofing after tiling in Al Uqayr

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.

We serve Al Uqayr and around itIncluding Al Durra (near Ghunan), Ibn Dihman and Al Aqiq (near Dhahran), as part of our work across the Eastern Province.

Al Uqayr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing after tiling in Al Uqayr

How do you locate a leak under the tiles in an Al Uqayr pool?

The photos you send show where dampness or wetness appears, which guides our search area. We examine the joints and cracks near that spot and check the condition of the tile and concrete beneath it.

Must all the tiles be removed to fix the leak?

Not always. If the leak is in a joint or small crack we may seal it without removing tiles. But if the concrete beneath is damaged we may need to remove a section of it, which the photos will indicate.

Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?

In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

Do you cover Al Uqayr?

Yes. We serve Al Uqayr and nearby areas such as Al Durra (near Ghunan), Ibn Dihman and Al Aqiq (near Dhahran), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

Nearby areas

Pool waterproofing after tiling near Al Uqayr

Nearby areas we also cover: Al Durra (near Ghunan), Ibn Dihman and Al Aqiq (near Dhahran).

Other services in the area

More services in Al Uqayr

Pool at night with water jets after waterproofing

Your first step in Al Uqayr:
a call or a WhatsApp message

Describe the problem and where it is in Al Uqayr, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp