Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Al Salmaniyah Second District

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Al Salmaniyah Second District

We treat leaks in tiled pools in Al Salmaniyah Second District by identifying the water's source, then sealing joints, cracks and fittings in the way suited to each case. Send pool photos by call or WhatsApp to begin.

Al Salmaniyah Second District has houses, villas and connected residential blocks, and its pools range from small courtyard ones to larger villa pools. In tiled pools leaks usually start at joints, edges and inlets, and some pools may have been altered or re-tiled at different times. The photos help separate visible cracks from problems that need deeper inspection.

  • Al Salmaniyah Second District is in Hofuf in the Eastern Province, lying near the First, Third and Fourth Al Salmaniyah districts.
  • Pools that have been re-tiled more than once usually need their old joints checked before any treatment is added.
What the service includes

The main items of pool waterproofing after tiling in Al Salmaniyah Second District

  • Injecting cracks with a compound suited to the concrete shell
  • Closing pump, light and return fittings from inside
  • Watching the water level after filling to confirm the leak is closed
  • Resealing joints with a flexible water-resistant compound
How we work

This is how we work in Al Salmaniyah Second District

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.

Start from Al Salmaniyah Second District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Pool waterproofing after tiling in Al Salmaniyah Second DistrictWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing after tiling in Al Salmaniyah Second District

Does the work differ if the pool has been re-tiled?

Often yes, since earlier layers may hide old joints or cracks. The photos and inspection show whether the leak lies in the new or the older layer.

Do you treat leaks in a villa pool in Al Salmaniyah Second District?

Yes, we serve this district. Send photos of the pool, its edges and fittings, and tell us where you see damp so we can decide where inspection begins.

Do you cover Al Salmaniyah Second District?

Yes. We serve Al Salmaniyah Second District and nearby areas such as Al Salmaniyah First District, Al Salmaniyah Forth District and Al Salmaniyah Third District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How do I know my pool is leaking and not just evaporating?

Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.

Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?

In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.

What decides the cost of waterproofing a pool after tiling?

The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Nearby areas

Pool waterproofing after tiling near Al Salmaniyah Second District

We also work near Al Salmaniyah Second District, in Al Salmaniyah First District, Al Salmaniyah Forth District and Al Salmaniyah Third District.

Other services in the area

More services in Al Salmaniyah Second District

Pool at night with water jets after waterproofing

Tell us about your site in Al Salmaniyah Second District
and we will plan the next step with you

Call us or send photos of the pool and any suspect areas on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp