
Pool waterproofing after tiling in Al Qadisiyah
Pool waterproofing after tiling in Al Qadisiyah starts with a photo of the pool and leak location, sent by call or WhatsApp. The district has modern and mid-range villas and apartment buildings, many of which have private pools where leaks can appear.
Pools in Al Qadisiyah range from newly built to ones used for years. Leaks in a tiled pool usually come from weakened joints between tiles, separation of the lining from the floor, or cracks around pipes. High summer temperatures and residual humidity affect the adhesives. Photos show the leak location clearly so we can choose the right solution without guesswork.
- Al Qadisiyah is a district in the Eastern Province near Ghirnatah, Ad Dabab and Ettisalat, with modern villas and apartment buildings.
- An open tiled pool goes through regular cycles of heat and relative coolness, causing expansions that weaken joints and seals.
The pool waterproofing after tiling work in Al Qadisiyah
- Lifting damaged tiles and rebuilding the layer behind them where needed
- Injecting cracks with a compound suited to the concrete shell
- Closing pump, light and return fittings from inside
- Watching the water level after filling to confirm the leak is closed
From first contact to the finished job in Al Qadisiyah
Send photos of the pool
On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.
Locate the source of the leak
A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.
Treat the leak point
Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.
Verify and cure
After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.
Why Abraj Al Azl?
Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.
Pool waterproofing after tiling in Al QadisiyahWe choose the method and the materials once we know the condition of the spot.
Your request from Al Qadisiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
Common questions on pool waterproofing after tiling in Al Qadisiyah
If we see water seeping from under the pool, is the pool always the source?
Usually yes, but there may be another cause. Photos and inspection help us tell the difference. Send us pictures of the leak location and surroundings so we can pinpoint the problem.
Can we fix a leak in an old pool without draining it completely?
It depends on the leak location, depth and the pool's condition. Some repairs need only partial draining and others require complete emptying. The photos will tell us what is needed.
Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?
In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.
Does the pool have to be emptied before the leak is found?
Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.
What decides the cost of waterproofing a pool after tiling?
The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.
Do you offer pool waterproofing after tiling in Al Qadisiyah?
Yes. Al Qadisiyah is within our service area in the Eastern Province, and we also work in Ghirnatah (near Dammam), Ad Dabab (near Al Athir) and Ettisalat. Call us or send photos of the spot on WhatsApp.
Areas near Al Qadisiyah
Nearby areas we also cover: Ghirnatah (near Dammam), Ad Dabab (near Al Athir) and Ettisalat.
More services in Al Qadisiyah


