
Pool waterproofing after tiling in Al Majidiyah District
Pool waterproofing after tiling in Al Majidiyah District starts with a photo of the pool and where it leaks, sent by call or WhatsApp. The district holds houses and villas of varying sizes, many with private pools in the yard or garden, and these pools need prompt attention when leaks appear.
Homes and villas in Al Majidiyah District vary in age and design, so their pools differ in size, material and lining. An older pool with original tiling may show cracks at the joints between tiles and walls, while a newer one may leak around drain openings or entry points. The dry summer heat speeds up fine cracks in the tiles, and the photos will show clearly where the leak is and what kind it is before treatment is chosen.
- Al Majidiyah District is a residential area in the Eastern Province, close to Ar Rabwah, Al Badriyah and Al Muhandisin districts, with varied homes and villas.
- In an exposed pool, constant sun exposure affects the joints between tiles, which may cause slow leaks along the walls and floor.
The pool waterproofing after tiling work in Al Majidiyah District
- Injecting cracks with a compound suited to the concrete shell
- Watching the water level after filling to confirm the leak is closed
- Closing pump, light and return fittings from inside
- Resealing joints with a flexible water-resistant compound
The steps of pool waterproofing after tiling in Al Majidiyah District
Send photos of the pool
On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.
Locate the source of the leak
A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.
Treat the leak point
Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.
Verify and cure
After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.
Why Abraj Al Azl?
Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.
Al Majidiyah District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Pool waterproofing after tiling in Al Majidiyah DistrictWe choose the method and the materials once we know the condition of the spot.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Questions about pool waterproofing after tiling in Al Majidiyah District
How do you locate the leak source in a tiled pool?
From the photos you send, we see where water is lost and where tiles are cracked or damp. We may ask for images from different angles to pinpoint the problem before treatment begins.
Must all the tiles be replaced to stop a leak in an Al Majidiyah pool?
Not always. If cracks are only in the joints and seams, we can treat them directly without removing tiles. But photos will show whether the concrete underneath is damaged enough to need more extensive work.
Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?
In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.
Do you cover Al Majidiyah District?
Yes. We serve Al Majidiyah District and nearby areas such as Ar Rabwah District, Al Badriyah District and Al Muhandisin District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
How do I know my pool is leaking and not just evaporating?
Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.
What is the difference between resealing joints and injecting cracks in a pool?
A joint is the line between two tiles or between a tile and a fitting, and it is resealed with a flexible water-resistant compound that tolerates shell movement. A crack is a break in the concrete or render behind the tile, and it is injected with a compound that fills the void and stops it spreading. The source determines which treatment is used.
Areas near Al Majidiyah District
We also offer pool waterproofing after tiling in Ar Rabwah District, Al Badriyah District and Al Muhandisin District, among the closest areas to Al Majidiyah District.
More services in Al Majidiyah District


