Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Al Khafji Customs

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Al Khafji Customs

Pool waterproofing after tiling in Al Khafji Customs starts with photos and a call to locate the leak source, then seal joints and cracks. The area has houses and private grounds where pools often show leaks around tiles or at the basin floor.

Pools in this coastal area face multiple stresses: high humidity and salt air affect tiles and joints, while sun heat causes the concrete beneath to expand seasonally. A leak may start in a simple joint between tiles, around filter pipes, or in the basin floor itself. Photos show where dampness or staining appears on the surrounding walls, and then we treat the cause, not just the symptoms.

  • Al Khafji Customs is a village on the Arabian Gulf coast in the Eastern Province, close to Al Muruj and the Western Gulf.
  • Coastal pools suffer joint erosion from salt and constant humidity, making regular inspection essential.
What the service includes

The scope of the work in Al Khafji Customs

  • Resealing joints with a flexible water-resistant compound
  • Testing the leak area with dye and pressure-checking the lines
  • Closing pump, light and return fittings from inside
  • Injecting cracks with a compound suited to the concrete shell
How we work

How we carry out pool waterproofing after tiling in Al Khafji Customs

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.

Your request from Al Khafji Customs comes to usCall or WhatsApp on one number, and we answer you ourselves.

Pool waterproofing after tiling in Al Khafji CustomsWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing after tiling in Al Khafji Customs

How do you locate the leak source in a tiled pool?

We ask for photos of damp patches and staining on walls and floors around the pool, and where water first appears. This guides us to the leaking joint or crack, then we choose the repair method based on location and damage.

Does leak repair differ in Al Khafji Customs from inland areas?

Yes, coastal salt and humidity accelerate erosion, so we use materials that resist these factors more strongly. Your photos and details help us choose the solution best suited to your location's conditions.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

What is the difference between resealing joints and injecting cracks in a pool?

A joint is the line between two tiles or between a tile and a fitting, and it is resealed with a flexible water-resistant compound that tolerates shell movement. A crack is a break in the concrete or render behind the tile, and it is injected with a compound that fills the void and stops it spreading. The source determines which treatment is used.

What decides the cost of waterproofing a pool after tiling?

The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Do you cover Al Khafji Customs?

Yes. We serve Al Khafji Customs and nearby areas such as Western Arabian Gulf, Eastern Arabian Gulf and Al Muruj (near Al Khafji), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Areas near Al Khafji Customs

We also work near Al Khafji Customs, in Western Arabian Gulf, Eastern Arabian Gulf and Al Muruj (near Al Khafji).

Other services in the area

More services in Al Khafji Customs

Pool at night with water jets after waterproofing

Pool waterproofing after tiling in Al Khafji Customs?
Call us now

Call us or send photos of the pool and any suspect areas on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp