Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Al Jud

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Al Jud

Pool waterproofing after tiling in Al Jud begins with photos sent by call or WhatsApp, to pinpoint the leak source in joints, cracks and openings. Al Jud has villas and residential blocks, and many residents have private pools requiring skilled sealing after tiling.

Pools in Al Jud range from small family swimming areas to larger pools in big villas. Tiles cover the pool surface and walls, but water penetrates thin cracks beneath the tiles, in joints between them and around various openings. Moisture in the area eases water seepage into the sandy soil beneath the pool basin. The photos you send show exactly where the leak is and the right treatment for it.

  • Al Jud is a district in the Eastern Province, near Al Iskan Al Janubi, Al Amal and Al Urubah, with villas and residential blocks.
  • In tiled pools, tile joints and openings around pipes are the most vulnerable spots for leaking.
What the service includes

What the service covers in Al Jud

  • Closing pump, light and return fittings from inside
  • Testing the leak area with dye and pressure-checking the lines
  • Watching the water level after filling to confirm the leak is closed
  • Injecting cracks with a compound suited to the concrete shell
How we work

The steps of pool waterproofing after tiling in Al Jud

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.

Start from Al Jud with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Al Jud and around itIncluding Al Iskan Al Janubi, Al Amal (near Dhahran) and Al Urubah (near Dhahran), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing after tiling in Al Jud

Does pool leakage affect the soil quality beneath it?

Yes, leaking water saturates the sandy soil and raises moisture levels. This can affect foundation stability and soil quality near the pool. That is why stopping the leak early is important.

Must the pool be completely drained before treating the leak?

It depends on the leak's location and depth. We may only need to lower the water level or drain it completely. Photos and our initial call help us tell you what is needed before we start.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

What is the difference between resealing joints and injecting cracks in a pool?

A joint is the line between two tiles or between a tile and a fitting, and it is resealed with a flexible water-resistant compound that tolerates shell movement. A crack is a break in the concrete or render behind the tile, and it is injected with a compound that fills the void and stops it spreading. The source determines which treatment is used.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

Is Al Jud within your service area?

Yes, Al Jud is one of the areas we work in, as are Al Iskan Al Janubi, Al Amal (near Dhahran) and Al Urubah (near Dhahran). To start, call us or message us on WhatsApp.

Nearby areas

The same service in nearby areas

We also work near Al Jud, in Al Iskan Al Janubi, Al Amal (near Dhahran) and Al Urubah (near Dhahran).

Other services in the area

More services in Al Jud

Pool at night with water jets after waterproofing

We start with you in Al Jud
with one call

Describe the problem and where it is in Al Jud, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp