Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Al Faqah

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Al Faqah

A leak in a tiled pool in Al Faqah is treated by first locating its source, then sealing the joints, cracks and fittings. Send photos of the pool to us by call or WhatsApp.

Al Faqah is a small village of homes, farms and open land, and many households build a pool in the yard or behind the house. A leak after tiling usually shows around the edges and at the inlets and outlets, rather than in the middle of the pool. The photos help establish whether the fault is in the tiled surface or deeper, and that decides the type of work.

  • Al Faqah is a village in the Al-Ahsa governorate of the Eastern Province, close to Al Kadadiya Al Sharqiya, Ishbiliyah and Ar Rabwah.
  • Inlets, outlets and corner joints are the spots most exposed to leaks after tiling.
What the service includes

What the service covers in Al Faqah

  • Lifting damaged tiles and rebuilding the layer behind them where needed
  • Closing pump, light and return fittings from inside
  • Testing the leak area with dye and pressure-checking the lines
  • Resealing joints with a flexible water-resistant compound
How we work

How we carry out pool waterproofing after tiling in Al Faqah

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.

Pool waterproofing after tiling in Al FaqahWe choose the method and the materials once we know the condition of the spot.

Al Faqah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing after tiling in Al Faqah

Does my pool in Al Faqah need to be emptied to check for a leak?

It may be needed for some detailed checks, while photos alone may suffice in other cases. Tell us what water you see and where, and we will decide with you whether the check requires draining.

What sets waterproofing a tiled pool in Al Faqah apart from a new pool?

A tiled pool already exists, so the fault must be reached without extensive demolition. The work starts by locating the weak point and then treating it locally.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

Is Al Faqah within your service area?

Yes, Al Faqah is one of the areas we work in, as are Al Kadadiya Al Sharqiya, Ishbiliyah (near Abqaiq) and Ar Rabwah (near Abqaiq). To start, call us or message us on WhatsApp.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

How do I know my pool is leaking and not just evaporating?

Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.

Nearby areas

Areas near Al Faqah

We also offer pool waterproofing after tiling in Al Kadadiya Al Sharqiya, Ishbiliyah (near Abqaiq) and Ar Rabwah (near Abqaiq), among the closest areas to Al Faqah.

Other services in the area

More services in Al Faqah

Pool at night with water jets after waterproofing

Your first step in Al Faqah:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp