Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Al Amanah

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Al Amanah

Pool waterproofing after tiling in Al Amanah starts with sending a photo of the pool and leak location by call or WhatsApp. The area has modern villas and varied apartment buildings, many with pools that may develop leaks with use.

Pools in Al Amanah range from newly built to older ones that have been used for a long time. Leaks in a tiled pool come from accumulated stress on joints and seals or from separation of the protective layer under the tile. Fierce summer heat and dryness affect the adhesives and flexibility. Photos show the leak location clearly so we can decide whether to treat the spot or investigate deeper damage.

  • Al Amanah is a district in the Eastern Province near Ash Shrouk, Al Matar and Al Fursan, with villas and apartment buildings on plots of multiple sizes.
  • Tile subjected to direct heat and repeated use can have its joints and seals separate from the base, allowing water to seep beneath it.
What the service includes

The main items of pool waterproofing after tiling in Al Amanah

  • Injecting cracks with a compound suited to the concrete shell
  • Resealing joints with a flexible water-resistant compound
  • Lifting damaged tiles and rebuilding the layer behind them where needed
  • Testing the leak area with dye and pressure-checking the lines
How we work

From first contact to the finished job in Al Amanah

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.

Al Amanah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Amanah and around itIncluding Ash Shrouk (near An Nabiyah), Al Matar (near An Nabiyah) and Al Fursan, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing after tiling in Al Amanah

If a leak starts shortly after the pool is built, is there a defect in the original construction?

There may be, but the cause could also be the area's dryness and heat. Photos and inspection help us distinguish between a construction defect and natural stress.

Can we repair a leaking pool without emptying it completely?

It depends on the leak location and depth. Some repairs can be done with only partial water level reduction. Photos and inspection will tell us what is needed.

What decides the cost of waterproofing a pool after tiling?

The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?

In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.

What should I send you from Al Amanah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Amanah, and we will work out the next step with you.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

Nearby areas

The same service in nearby areas

We also offer pool waterproofing after tiling in Ash Shrouk (near An Nabiyah), Al Matar (near An Nabiyah) and Al Fursan, among the closest areas to Al Amanah.

Other services in the area

More services in Al Amanah

Pool at night with water jets after waterproofing

Tell us about your site in Al Amanah
and we will plan the next step with you

Call us or send photos of the pool and any suspect areas on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp