Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Al Adhiriyah

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Al Adhiriyah

Treating a leaking tiled pool in Al Adhiriyah begins with finding where the water is escaping, then sealing the joints, cracks and fittings around the pool. Send photos by call or WhatsApp so we can understand the problem.

Al Adhiriyah is a village of houses and villas spread across separate neighbourhoods, and its pools are often in small back or front yards. Damp can build up around the pool edge in these tight spaces and show as wet paving. The photos indicate whether water is leaving through the tiles or through a fitting before any repair plan is set.

  • Al Adhiriyah is a village in the Eastern Province, near Ar Rayaan, Eshbilya and Al Kawthar.
  • Filter and pump fittings are often where leaks first appear in smaller pools.
What the service includes

What we do for you in Al Adhiriyah

  • Closing pump, light and return fittings from inside
  • Testing the leak area with dye and pressure-checking the lines
  • Watching the water level after filling to confirm the leak is closed
  • Lifting damaged tiles and rebuilding the layer behind them where needed
How we work

The steps of pool waterproofing after tiling in Al Adhiriyah

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.

We serve Al Adhiriyah and around itIncluding Ar Rayaan (near Al Adhiriyah), Eshbilya and Al Kawthar (near Ar Rafiah), as part of our work across the Eastern Province.

Your request from Al Adhiriyah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing after tiling in Al Adhiriyah

Why is the area around my pool wet without much water loss?

A small leak at a fitting or joint can wet the surrounding ground before the water level shows any real change. Photos and an inspection of the spot will identify the source.

Can a tiled pool in a small yard be treated?

Yes, a tight space does not prevent treatment, though it affects how the work is sequenced. Tell us where the pool sits and how we can reach it when you send the photos.

How do I request pool waterproofing after tiling in Al Adhiriyah?

Call us, or send clear photos of the spot and its location in Al Adhiriyah on WhatsApp, and we will work out the next step with you.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

What decides the cost of waterproofing a pool after tiling?

The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

Nearby areas

The same service in nearby areas

We also work near Al Adhiriyah, in Ar Rayaan (near Al Adhiriyah), Eshbilya and Al Kawthar (near Ar Rafiah).

Other services in the area

More services in Al Adhiriyah

Pool at night with water jets after waterproofing

Tell us about your site in Al Adhiriyah
and we will plan the next step with you

Call us or send photos of the pool and any suspect areas on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp