Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Ad Dawhah Ash Shamaliyah

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Ad Dawhah Ash Shamaliyah

Pool waterproofing after tiling in Ad Dawhah Ash Shamaliyah starts with finding where the water escapes, not with sealing the surface. Send photos of the pool and its tiled area by call or WhatsApp, and we will explain what the images show. Joints, cracks and fittings are treated once the source is clear.

Ad Dawhah Ash Shamaliyah is a residential district of the Eastern Province with a mix of villas and apartment blocks. Private pools are most often found in villa gardens, where the tiled shell and its steps take the daily movement of water and sun. Leaks here tend to appear at tile joints, around the skimmer and return fittings, and along the edge where the coping meets the basin. Photos and a note of when the water level drops help narrow the search before any sealing starts.

  • Ad Dawhah Ash Shamaliyah is a district in the Eastern Province, close to Ad Danah Al Janubiyah and Qurtubah.
  • Tile joints and fittings are the usual first points of water loss in a tiled pool.
What the service includes

The main items of pool waterproofing after tiling in Ad Dawhah Ash Shamaliyah

  • Watching the water level after filling to confirm the leak is closed
  • Closing pump, light and return fittings from inside
  • Injecting cracks with a compound suited to the concrete shell
  • Lifting damaged tiles and rebuilding the layer behind them where needed
How we work

This is how we work in Ad Dawhah Ash Shamaliyah

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.

Your request from Ad Dawhah Ash Shamaliyah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Ad Dawhah Ash Shamaliyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing after tiling in Ad Dawhah Ash Shamaliyah

Can a leaking tiled pool be treated without retiling it all?

Often, yes, when the leak comes from joints, cracks or fittings rather than the whole shell. The source is located first, and the photos help show whether the repair stays local or needs more work.

Do you treat leaks in private villa pools in Ad Dawhah Ash Shamaliyah?

Yes, we serve Ad Dawhah Ash Shamaliyah. Share photos of the pool, its steps and fittings by call or WhatsApp, and tell us where you first noticed the water dropping so we can agree the next step.

What decides the cost of waterproofing a pool after tiling?

The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

How do I know my pool is leaking and not just evaporating?

Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.

Do you cover Ad Dawhah Ash Shamaliyah?

Yes. We serve Ad Dawhah Ash Shamaliyah and nearby areas such as Ad Danah Al Janubiyah, Ad Dawhah Al Janubiyah and Qurtubah (near Al Khobar), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Ad Danah Al Janubiyah, Ad Dawhah Al Janubiyah and Qurtubah (near Al Khobar).

Other services in the area

More services in Ad Dawhah Ash Shamaliyah

Pool at night with water jets after waterproofing

Pool waterproofing after tiling in Ad Dawhah Ash Shamaliyah?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp