Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in First Industrial Area

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in First Industrial Area

Pool waterproofing after tiling in the First Industrial Area begins with a photo of the pool and fault location, sent by call or WhatsApp. The area has industrial buildings and warehouses, some with pools for staff or leisure use, and these pools face constant stress.

Pools in the Industrial Area serve staff and workers, so they see heavy use. Tiles, joints and pipes bear more stress than private pools, and leaks may show sooner. Photos reveal the problem's location and extent before any work, and repair method varies depending on whether the leak is in the structure or fittings.

  • The First Industrial Area is a district in the Eastern Province, near Al Lualu and Al Huwaylat, with diverse industrial buildings.
  • Heavily used pools at industrial sites need prompt leak treatment to prevent work disruption.
What the service includes

What the service covers in First Industrial Area

  • Testing the leak area with dye and pressure-checking the lines
  • Resealing joints with a flexible water-resistant compound
  • Watching the water level after filling to confirm the leak is closed
  • Injecting cracks with a compound suited to the concrete shell
How we work

The stages of the work in First Industrial Area

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.

Pool waterproofing after tiling in First Industrial AreaWe choose the method and the materials once we know the condition of the spot.

First Industrial Area is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing after tiling in First Industrial Area

Can a leak in a staff pool be fixed without closing it?

Some repairs can be done while the pool is in use, especially if the leak is in pipes or fittings. If it is in the tile or lining, temporary draining may be needed. Send detailed photos so we can decide the best approach.

How often should industrial pools be checked for leaks?

It depends on the pool's age and use. Older and heavily used pools need regular monitoring, and periodic photos help catch problems early before they worsen.

How do I know my pool is leaking and not just evaporating?

Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.

Is First Industrial Area within your service area?

Yes, First Industrial Area is one of the areas we work in, as are Al Lualu (near Ghizlan), Al Huwaylat and Ash Shati (near Ghizlan). To start, call us or message us on WhatsApp.

What decides the cost of waterproofing a pool after tiling?

The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

Nearby areas

Areas near First Industrial Area

Nearby areas we also cover: Al Lualu (near Ghizlan), Al Huwaylat and Ash Shati (near Ghizlan).

Other services in the area

More services in First Industrial Area

Pool at night with water jets after waterproofing

Tell us about your site in First Industrial Area
and we will plan the next step with you

Describe the problem and where it is in First Industrial Area, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp