Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in First Industrial (near Dammam)

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in First Industrial (near Dammam)

In First Industrial we treat leaks in tiled pools by first locating where the water escapes, then sealing the damaged joints, cracks and fittings. Send photos of the pool and its surroundings by call or WhatsApp to start the diagnosis.

The area is largely residential buildings and facilities near industrial zones, so pools may sit in rear yards or on building roofs. Tile surfaces left open heat up sharply, and grout expands and weakens at edges and around filters. We locate the leak from the photos and a check of the joints, then decide how to repair it.

  • First Industrial is a district in the Al-Ahsa governorate of the Eastern Province, near Al Basatin, Al Muntazah and An Nahdah.
  • Roof-mounted pools take more direct heat, so their grout moves more than ground-level pools.
What the service includes

What the service covers in First Industrial (near Dammam)

  • Testing the leak area with dye and pressure-checking the lines
  • Lifting damaged tiles and rebuilding the layer behind them where needed
  • Injecting cracks with a compound suited to the concrete shell
  • Resealing joints with a flexible water-resistant compound
How we work

The steps of pool waterproofing after tiling in First Industrial (near Dammam)

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.

Pool waterproofing after tiling in First Industrial (near Dammam)We choose the method and the materials once we know the condition of the spot.

Start from First Industrial (near Dammam) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing after tiling in First Industrial (near Dammam)

Can you treat leaks in roof pools in First Industrial?

Yes, though reaching the lower layers differs from a ground pool. Your photos and the inspection show what can be repaired without fully draining it.

How can I tell if water is leaking from the pool or just evaporating?

Evaporation slows at night and on cool days, whereas a leak continues and damp patches appear around the pool. Send notes on the water drop and photos of the surrounding area so we can tell them apart.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

What decides the cost of waterproofing a pool after tiling?

The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

Do you cover First Industrial (near Dammam)?

Yes. We serve First Industrial (near Dammam) and nearby areas such as Al Basatin (near Dammam), Al Muntazah (near Dammam) and An Nahdah (near Dammam), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

The same service in nearby areas

We also offer pool waterproofing after tiling in Al Basatin (near Dammam), Al Muntazah (near Dammam) and An Nahdah (near Dammam), among the closest areas to First Industrial (near Dammam).

Other services in the area

More services in First Industrial (near Dammam)

Pool at night with water jets after waterproofing

Pool waterproofing after tiling in First Industrial (near Dammam)?
Call us now

Call us or send photos of the pool and any suspect areas on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp