Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Shiab

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Shiab

Cementitious pool waterproofing in Shiab begins with a photo of the pool and its surroundings sent by call or WhatsApp. The hamlet has villas with private pools, and cementitious coating seals the concrete and holds the tiles together securely.

Shiab consists of scattered villas with yards and gardens, many with private pools. Pools here range from older to newer, and maintenance differences affect tile and concrete condition. The region's extreme heat exposes the pool surface to sun all day, causing concrete shrinkage and cracking around corners and joints. Flexible coating tolerates this movement and prevents seepage. Photos show the damage severity before treatment is chosen.

  • Shiab is a small hamlet in the Eastern Province, near Ghizlan, An Naim and the second industrial area, with villas and small gardens.
  • Exposed pools in remote areas endure extreme heat, so cementitious coating must be flexible enough to tolerate expansion and contraction.
What the service includes

What we do for you in Shiab

  • Cleaning the concrete surface and removing any adhesive residue or dust
  • Treating hairline cracks and the wall-to-floor junction
  • Applying the flexible cementitious layer over the whole shell
  • Checking the pool walls and floor and locating cracks and openings
How we work

The stages of the work in Shiab

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Your request from Shiab comes to usCall or WhatsApp on one number, and we answer you ourselves.

Shiab is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Shiab

Does cracked tile mean the concrete underneath is broken?

Not always. Surface cracks in tiles may be due to concrete movement or poor original tile adhesive. Clear photos of the cracking pattern will help us determine whether the concrete is sound or needs deeper treatment.

After waterproofing the pool, should it be kept empty for care and maintenance?

After coating application, the pool should remain empty for a set period while the coating fully cures. We will advise you on the exact timeframe when work begins before you refill the pool.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

Do you offer cementitious pool waterproofing in Shiab?

Yes. Shiab is within our service area in the Eastern Province, and we also work in Ghizlan, An Naim and second industrial (near Ra's Tannurah). Call us or send photos of the spot on WhatsApp.

How does cementitious waterproofing differ from other pool coatings?

Cementitious waterproofing is cement-based with flexible additives; it bonds to concrete and accepts tile adhesive directly on top. Other types such as polyurethane or epoxy have different properties and suit different situations. The choice depends on the concrete condition and whether tiles are going on, which the photos help us work out.

How do I know if the concrete is ready for the cementitious coating?

The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.

Nearby areas

The same service in nearby areas

We also work near Shiab, in Ghizlan, An Naim and second industrial (near Ra's Tannurah).

Other services in the area

More services in Shiab

Empty seaside pool during waterproofing

Your first step in Shiab:
a call or a WhatsApp message

Call us or send photos of the pool walls and floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp